--� � <br /> devices and related pharmaceuticals in three phases over a ten to fifteen year <br /> period. At full build out, the campus would include a manufacturing/warehouse <br /> building, an administrative office building, two large research and development <br /> buildings, a small building for the Marine Science Institute, and two five-level parking <br /> structures. The buildings are proposed to be arranged around a large central open <br /> space plaza. The building� and campus interior would be secured from p��blic <br /> access. Public access via a n•ulti-use path along the waterfront would be providec in <br /> a 100-foot deep landscaped open space area. Development of the proposed <br /> campus is briefly summarized below: <br /> • Demolition: The remaining structures, buildings, and equipment that were <br /> formerly used for salt processing by the previous property owner, Cargili, will <br /> be removed. Temporary classroom structures used by the Marine Science <br /> Institute would be removed. <br /> • Phase 1: Phase 1 includes 200,000 square feet of manufacturing, <br /> warehouse, research and development, and administrative office floor area in <br /> two buiidings. A 10,000 square foot permanent building for the Marine <br /> Science Institute would aiso be included in Phase 1. All parking would be <br /> provided in surtace lots. <br /> • Phase 2: Phase 2 includes a 176,000 square foot, five-story research and <br /> development building and a five-levei parking structure. <br /> • Phase 3: Phase 3 includes a 165,000 square foot, five-story research and <br /> development building and another five-level parking structure. The Phase 3 <br /> research and development building would include a child care center for <br /> Abbott employees. The size of the center would be dependent upon a needs <br /> assessment of the campus employees. <br /> • Open Space: The proposed campus includes both publicly accessible open <br /> space along the waterfront edge, and interior quad "plazas" for Abbott <br /> employees. The waterfront would be made accessible to the public upon <br /> completion of Phase 1. The complete development of the waterfront, <br /> including landscaping, the provision of site furniture, and path treatment <br /> would be phased with the building phases and in consideration of existing <br /> easements in the waterfront area <br /> Previously, project plans and phasing information were provided to the Planning <br /> Commission in a bound project submittal document, prepared by the applicant. <br /> More specific project details and additional plans will be provided and discussed <br /> at a future public hearing before the Planning Commission when the Planned <br /> Development Permit and Tentative Map are considered for approval. <br /> ENVIRONMENTAL IMPACT REPORT: An Environmental Impact Report (EIR) <br /> has been prepared to assess the potential environmental impacts of the <br /> proposed project. The EIR must be certified before any of the other application <br /> requests can be considered. Certification does not constitute project approval, <br /> but rather means that the Planning Commission has concluded the following: <br />