My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-04-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-04-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:07:06 PM
Creation date
4/23/2004 8:27:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�-c.-22 <br /> CITY OF REDWOOD CITY - CINEMA STREETSCAPE PROJECT <br /> PRELIMINARY TASK SCHEDULE - Apri114, 2004 <br /> The following is a Preliminary Outline Task Schedule for the Project Teazn's work and estimated <br /> timetable. 't is the same tas!: list as shown in FTB's Scope of Services V.4 dazed April 1, 2004. Tasks of <br /> subconsultaz:rs are not shown �n this exhibit, but esGmated times of major subailttals and City meetings <br /> ue noted. A re5ned and more �etailed schedule will be prepared under contract in Phase I, Task 2, using <br /> Microsoft Project and additional coordination among all subconsultants. <br /> Selected Abbreviations: <br /> Arch. = Architect <br /> CE = Civil Engineer <br /> D/D = Design Development <br /> FTB = Freedman Tung & Bonomley <br /> Ltg. = lighting <br /> Mtg. = meeting <br /> Reg. = requirement(s) <br /> PHASE I: DESIGN DEVELOPMENT <br /> 1. Receive updated sur.�ey and files from Slooten Consulting Early May 2004 <br /> A. Receive/review files & settings, distribute to team <br /> B. Coord/troubleshoot file and layer parameters <br /> 2. Prepare schedule for project completion Early May 2004 <br /> A. Attend worldng session w/PS&E Team (mtg #1) <br /> B. Prepare Gantt Chart for FTB portion <br /> C. Receive/review ream schedules; coordinaGng discussions <br /> D. Modify FTB schedule as needed; fwd to City w/memo <br /> 3. General D/D Coordination with PS&E Team Early May 2004 <br /> 4. Street Geometrics May-J�ne 2004 <br /> A. Areas btwn bldgs and right-of-way (e.g. entrance <br /> recesses) <br /> B. Verify Utility box and cabine[ conflic[s with Engineer <br /> C. Coord dev of striping plans with City Staff <br /> D. Special locations for discussion with Tiaffic Engineer <br /> 1. Refinement of Broadway section and transitions <br /> 2. Final adjustments to Jefferson layout <br /> 3. Final adjustrnenu to Middlefield layout <br /> 4. Coordinate development of striping plans with City <br /> Staff <br /> E. D/D Street Geometrics: produce digital streetscape plans <br /> F. FormaUaansmit layout of prelim. geometrics files to CE <br /> 1. Coordina[e/voubleshoo[ file uansfer protocol <br /> 2. FormaUtransmit to civil engineer; respond to quesdons <br /> 3. Tel. conference re utility, pkg garage or other conflicts <br /> 4. Respond to CE req's, adjust geometrics as necessary <br /> G. Grading Concept & station points - coord w/SFE & CE <br /> 1. Rec/Revw concept grading plan f'rom Slooten <br /> Consulting <br /> 2. Coord with Slooten re concept gcading layoudcriteria May-June 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.