Laserfiche WebLink
i� 1' ■ l 9 l ■ I� . <br /> F�• C,- 23 <br /> � <br /> 3. Respond to CE req's, adjust geometrics as necessary <br /> 5. Mfd. Fumishings D/D - coord w/mfrs for specs, dwg data <br /> A. Customized catalog fumishings —coordinate ��/mf. s. mid-June 2004 <br /> B. Catalog Furnishings - bollards, bench, newsrac:'c, ei •. " -- - <br /> C. City standard fumishings - tree grate, etc. � <br /> D. Revw session w%City staff re: items A-C (@ FTB-SF) May-June 2004 <br /> E. Make mods per City Staff comments, distribute to subs <br /> 6. Custom Fumishing D/D <br /> A. Theatre Way Planter Column (typical) <br /> B. Theatre Way �rateways (2) <br /> C. Start-up session with production architect <br /> D. Receive/review D/D sheets from production architect May-June 2004 <br /> E. Follow up review/coordinadon with landscape architect <br /> 7. Lighting Design Development <br /> A. Define lighang effects for Lighting Design Consultant <br /> 1. Prep pkg of stlight layouts & notes; confirm City's prefs <br /> 2. Develop planter column and gateway lighting effects <br /> 3. Develop palm and deciduous aee uplighting effects <br /> B. Coord w/Itg designer & azch. for draft design recs <br /> 1. Mtg wlltg designer & architect re lighting <br /> parameters <br /> 2. Follow up phone/fax coordinaaon, answer quesaons <br /> `� C. Rec/revw draft fixtures, design, photometrics package <br /> 1. Rec/Revw draft design recs, make redline comments <br /> 2. Mtg wAtg dsnr & arch for comments, final direction <br /> 3. Follow up phone/fa�c coordination, answer questions <br /> D. Rec re£ined ltg design & recs, adjust DD plans as req'd May-June 2004 <br /> 1. Redrevw fnl ltg dwgs & specs; follow up tel conf <br /> 2. Transmit updated dwgs to RC Electric, SFE, Slooten <br /> 8. Planting D/D - plans & detail selecticns <br /> A. Confirm plant material recs, clearances, addl parameters <br /> 1. Date Palm tree <br /> 2. Deciduous sveet tree 1 <br /> 3. Deciduous s[reet tree 2 <br /> 4. Coord w/SFE and City on selections (via tel & fax) <br /> B. Other plant material selecUons (coord w/SFE & arborist) <br /> 1. Planter column <br /> 2. Planter pots June-early July 21N14 <br /> 3. Median planting (Broadway oNy) <br /> C. Tree wells - aesthetic treatments <br /> 9. Complete D/D Level Design. <br /> A. Receive/review file from Slooten Consulting <br /> B. Theatre Way - detailed layout & design <br /> 1. Granite Paving I.ayout; teirace, bands, entryways, street <br /> ,.-- 2. Concrete Paving Layour, banding and scoring pat[ems <br /> 2 <br />