Laserfiche WebLink
� �- 2� <br /> 3. Stair curb & nosings <br /> 4. Plinth (base for planter column) detail <br /> 5. Roadway & pazking/tree area <br /> 6. Derail of bollard and stlight interface w/decorative pvg <br /> 7. Cinema Entry Plaza paving ; �attem <br /> 8. Street Cmteway areas (2) <br /> 9. L.ocate bollards & railing @Mi,ldlefield/I'heatre Way <br /> 10. UGlity vault areas <br /> 1 I. Sidewalk on west side <br /> 12. Finalize trench drain details <br /> 13. Finalize location of all street fumituce <br /> 14. Pazking garage slab control joint <br /> C. Broadway - derailed layout & design <br /> ]. Special Theatre Way comer conditions <br /> 2. Special7efferson comer conditions � <br /> 3. Median layout and planting <br /> 4. Drop-off area <br /> 5. Finalize location of benches, trash, and street uees <br /> 6. Detail paving design for ADA ramp <br /> D. Jefferson - detailed layout & design <br /> 1. Design of planters at pazking gazage entrance <br /> 2. Special sidewalk neaz garage enaance, bulb ouu etc. <br /> 3. Fnalize location of all street fumishings <br /> E. Middlefield Road - detailed layout & design <br /> 1. Typical sidewalk w/concrete pavin� pattem <br /> 2. Corner details (Jefferson at Middlefield Road) <br /> 3. Trees in pkg detaiis incl. plant ma[erials, curbing detail <br /> 4. Crosswalk areas <br /> 5. Finalize locadon of benches, trash, and street uees June-early JWy 2004 <br /> F. Format and vansmit files to Slooten Consuldng and SFE <br /> G Provide direction, respond to quesaons from design team <br /> ] 0. Mat'ls and Finishes - reseazch, info, samples & mock-up <br /> A. S[one Paving materials; terrace, bands, entryways, streec <br /> B. Concrete Paving; colors, banding and special finishes <br /> C. Precast concrete colors, materials, finishes <br /> D. Metal paint colors, finishes <br /> E. Coordinauon sessions w/ manufacturer reps (at FTB) Early July 2004 <br /> F. Coord w/ contrnctor on mock-up sample, provide info <br /> G. Coordinate follow-up modifications as required Augus[-September 2004 <br /> 11. Prepaze/assemble specification notes; transmit to SFE <br /> 13. 75% Submittal (Estimated 75% PS&E <br /> A. Streetscape plans & specs Quality Control submittal package to City: <br /> 1. Rec/rev sgl set of team dwgs & specs from Slooten late August 2004) <br /> 2. Draft and Transmit FTB comments ro PS&E team <br /> 3. Tel. follow-up with [eam to review Fi'B comments mid-September 2004 <br /> B. Custom fumishing Quality Convol mid-September 2004 <br /> 1. Redrev drawings and specs from production azchitect late-September 2004 <br /> 3 <br />