My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-04-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-04-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:07:06 PM
Creation date
4/23/2004 8:27:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- (r,.11-�-I(� <br /> j. Cost Estimate - Prepare an updated detailed cost estimate of probabie <br /> construction cost that is within the Estimated Construction Cost (ECC) of <br /> $10,500,000. If the probable construction cost exceeds the ECC, the <br /> Architect shall submit to the City ad�iitive bid items for consideration. <br /> 4. Schedule and Submittals - Submit one !1 � sets of plans, draft specifications, <br /> and detailed cost estimate to the City within 90 calendar days, after approval <br /> of the Schematic Design. <br /> F. Final Construction Bid Documents <br /> 1. Prepare final plans, specifications and cost estimate suitabie for public bidding, <br /> in accordance with the approved Design Development by the California State <br /> Library's and the Ciry of Redwood City's review comments. Based on the <br /> approved Design Development Submittal, the Final Construction Bid <br /> Documents shall include, but not be limited to, a site plan, floor plan, exterior <br /> elevations, roof pian, building sections, details, interior elevations, reflected <br /> ceiling plan, window and door schedules, fumiture, fumishings and equipment <br /> plan, signage schedule and plan, assignable square footage comparison, civil, <br /> structural, mechanical, plumbing, electrical, lighting system plan with "cut" <br /> sheets for rype of fixtures, electrical data and distribution plan, and landscaping <br /> plan. <br /> 2. The Final Construction Bid Documents shall be pre�ared in accordance to the <br /> requirements of the Califomia State Library Bond Act Grant Recipient Submittal <br /> Checklist, Construction Documents Detail Checklist (Attachment 3) and City of <br /> Redwood City Standards. <br /> 3. The Final Construction Bid Documents shall be prepared suitable for public <br /> bidding with all elements thoroughly checked and coordinated by the <br /> consultant. The Design Professional agrees to maintain quality control <br /> procedures. The Design professional further agrees to follow those procedures <br /> to the extent that, in the Design Professional's judgment, the procedures are <br /> appropriate under the circumstances. The intent that the Design Professional <br /> provides a well-coordinated set of documents and specifications. All elements <br /> of the work shall be properly coordinated that there are minimal conflicts <br /> between the various architectural and engineering disciplines and minimal <br /> conflicts with the specifications. The Final Bid Documents shall include (as a <br /> minimum) the following: <br /> a. Civil - Civil Plans shall include the following: <br /> > Existing Topography: Existing topography shall be shown with one- <br /> foot contours, augmented with spot elevations. All existing utilities, <br /> including size and material, above and below ground, shall be shown. <br /> _� <br />
The URL can be used to link to this page
Your browser does not support the video tag.