My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-04-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-04-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:07:06 PM
Creation date
4/23/2004 8:27:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■ � ■ ■ a e l I 1� <br /> �' � I��i�- <br /> Benchmarks and horizontal control monuments to be used for the <br /> �"" project shail be shown and described in detail. Indicate limits of work. <br /> ➢ Demolition Fian: Indicate structures, foundations, pavements <br /> (including type a�d thickness) to be removed and salvaged; utility lines <br /> to be removed, r�routed or abandoned and trees and shrubs to be <br /> removed or salvaged. <br /> ➢ Site Plan: Locate all new work by coordinates and/or dimensions from <br /> prominent existing features or survey base lines. Use same scale and <br /> orientation as the existing topography pian. Locate contractor's <br /> temporary storage area as necessary. <br /> ➢ Grading Plan: <br /> ■ Show finished contours at one-foot intervals using solid lines and <br /> all existing contours using dash lines. <br /> ■ Clearly show where ail surface water will drain to catch basins or <br /> other outlets. <br /> ■ Use spot elevations to clarify grading requirements, drainage flow <br /> patterns, set curbs, gutters, pavement comers, ground and <br /> pavement surFaces at building comers, top of catch basins, etc... <br /> � <br /> ■ Show finished floor and pad elevations, borrow piUdisposal areas (if <br /> I <br /> applicable), and location of soil borings. Use same scale and <br /> orientation a <br /> s the topography plan. <br /> � Utility Plan: � <br /> • Locate by dimensions and/or coordinates all new water, sanitary <br /> sewer and storm drain lines and appurtenances. <br /> ■ Indicate sizes of all pipes, top and invert elevations of manholes <br /> and catch basins and points of connection. <br /> ■ Indicate size of all thrust restraints and their parameters. <br /> � Profiles: <br /> ■ Show profiles fo� all sanitary sewer and storm drain systems. <br /> ■ Indicate manholes, invert elevations, distance between manholes, <br /> slope of pipes, existing and proposed utilities and finish grades. <br /> • Show profile for water main� where possible interferences with <br /> existin utilities ma oc <br /> ,` <br /> g y cur. <br /> -s- <br />
The URL can be used to link to this page
Your browser does not support the video tag.