My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-04-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-04-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:07:06 PM
Creation date
4/23/2004 8:27:29 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
4/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
._■ I ■ l 9 ■ � I 1� <br /> �v�1N-21 <br /> augment the plans and details. Diagrams shall permit the tracing of fluid <br /> "` flow paths. <br /> ➢ Control Diaarams: Control diagrams shall be ir�luded to indicate <br /> function of various control systems involved in mech:�nical in.tallations. <br /> Control of inechanical equipment shall be coordinated r��ith the electricai <br /> engineer so that all equipment supplied by electrical work and <br /> mechanical work is clearly defined. <br /> ➢ Seauence of Ooeration: Complete, step-by-step sequence of operation <br /> shall be included in the specifications (and whenever practical, on the <br /> drawings) for each control system. <br /> ➢ EQUioment Schedule: Mechanical and plumbing plans shall include <br /> equipment schedules indicating capacity and description of each item of <br /> equipment and conditions under which each item is to operate. Provide <br /> voltage, phase, horsepower or amperage of all equipment requiring <br /> electrical power. <br /> ➢ Sei ' <br /> smic Anchora <br /> e: Plans shall include <br /> Q sufficient details for the <br /> attachment and anchorage of all mechanical equipment, piping systems, <br /> han ers su <br /> g pports, sway braces, etc. so as to be in compliance with <br /> codes and stancJards. <br /> f. Electrical: Electrical plans shall provide adequate information so that the <br /> electrical installation is complete and there is a clear indication as to where <br /> the work begins and ends. Tables shall identify circuits, protective devices, <br /> ratings, loads, phasing, controls, instrumentation and other pertinent <br /> information concerning the installation. As a minimum provide the following: <br /> ➢ Plot Plan: Required for overhead and underground power, street <br /> lighting, telephone, fire alarm, data, and distribution systems. <br /> � Wirina Diaaram: <br /> ■ Service shall include power, telephone, fire alarm, data, source <br /> available and any other special connections to outside systems. <br /> ■ Show locations of entering conduits and service racks. Service <br /> disconnect shall be rated to suit the conditions of the case. Metering <br /> shall be required unless directed otherwise. <br /> ■ Panel boards shall include breakers for feeders and branches of <br /> suitable rating. Conditions shall be analyzed to ensure that the <br /> wiring method used is acceptable and economical for the intended <br /> use of the facilities. <br /> �. <br /> -�a <br />
The URL can be used to link to this page
Your browser does not support the video tag.