My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-07-26
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:58:14 PM
Creation date
7/22/2004 2:42:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
7/26/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � �s� - �`� <br /> 5.4 Change Orders <br /> SBSA will not issue any change orders under the Construction Contract(s) <br /> without the prior written approval of City, irrespective of whether and by how <br /> much the change order affects the Construction Contract Price. <br /> 5.5 Pro ess Payments <br /> SBSA will make progress payments to the Construction Contractor as provided in <br /> SBSA's Standazd Specifications Section 00700, 8.0, Payment, the provisions for <br /> which are described in Attachment Seven. City shall reimburse SBSA for such <br /> payments upon presentation of invoices therefore, as provided in Section 7.3.2. <br /> 5.6 Acceptance <br /> SBSA will not accept the facilities from the Construction Contractor until they <br /> have been completed as required by the Construction Contract Documents and the <br /> Construction Contractor has delivered two sets (one for SBSA and one for City) <br /> of all submittals and shop drawings, "as built" record drawings, operations <br /> manuals, warranties/guarantees, and has provided all training required by the <br /> Construction Contract Documents to be provided by the Construction Contractor <br /> and/or its equipment suppliers, all in accordance with SBSA's Standard <br /> Specifications (September 2003 rev. 1) To the extent possible, such documents <br /> will be provided in electronic form. <br /> 5.7 Ownership of Facilities <br /> Upon acceptance by SBSA, ownership of the Recycled Water Facilities will <br /> transfer to SBSA. Immediately thereafter, SBSA shall transfer title to the <br /> facilities described as Items 3 through 9 and 11 in Attachment One to City, with <br /> no charge (in addition to those specified in Article 7) and employing documents <br /> -10- � o9i 3�a.� <br />
The URL can be used to link to this page
Your browser does not support the video tag.