Laserfiche WebLink
�•�1- �� <br /> 6.5 Operating Procedures <br /> SBSA will operate the Treatment Plant, including the Recycled Water Facilities 1, <br /> 2, 3 and 10 on Attachment One, in accordance with applicable permits and with <br /> the "Operational Plan — Recycled Water" to be described in the Engineering <br /> Report. <br /> 6.6 Maintenance and Repair <br /> SBSA will maintain the Treatment Plant, including the Recycled Water Facilities <br /> which it owns (Facilities 1, 2 and 10 on Attachment One), or which it is obligated <br /> to maintain under this Agreement (Facility 3), in good operating condition and <br /> repair. City will maintain the other Recycled Water Facilities in good operating <br /> condition and repair. City may inspect the Treatment Plant, including but not <br /> limited to Facilities 1, 2 and 10, at all reasonable times on 24 hours' prior notice <br /> to SBSA, with respect to the production of Recycled Water. <br /> 6.7 Replacement/Reconstruction <br /> If the Recycled Water Facilities located on SBSA's property and owned by SBSA <br /> (i.e., Facilities 1, 2 and 10) are damaged or destroyed, SBSA will restore or <br /> replace them as soon as reasonably practicable. If the facilities damaged or <br /> destroyed are owned by City, City will be obligated to restore or replace them as <br /> soon as reasonable practicable. However, if the restoration or replacement <br /> obligation of SBSA appeazs to be economically or practicably infeasible, SBSA <br /> shall so notify City and they shall meet and confer regarding a process for, and <br /> resolution of, the requirement for restoration or replacement and may, by <br /> amendment or supplement to this Agreement, provide for City's assumption of <br /> costs pertaining thereto and SBSA's conesponding construction obligation of <br /> -13- 1091374.7 <br />