Laserfiche WebLink
�, i -z <br /> Sta is administering the program following performance measure goals to retain at least <br /> 80% of the larger trees on a street and not remove more than two mature trees in a row. <br /> Adequate space (three-foot minimum) is necessary between the tree and new sidewalk to <br /> pertorm root pruning. Staff encourages property owners to preserve trees by allowing the <br /> City to establish a sidewalk maintenance easement on private propertywhen necessaryfor <br /> the relocation of the sidewalk. Failure to provide the easement �nrill not allow the <br /> necessary space to preserve the tree and will cause the site to be �passed over for <br /> permanent concrete repairs to avoid tree removal. A temporary asphz!t repair will be <br /> made to alleviate the defective walkway and reduce the pedestrian risk if a concrete repair <br /> site is bypassed. The City will return to bypassed locations on 5-year cycles to re-evaluate <br /> the tree and offer the concrete repair with easement. <br /> Property owners are also offered the opportunity to participate in cost shared repairs for <br /> defects of less than one-inch and may pay 100% of the repair cost for replacement of <br /> undamaged concrete. <br /> Alternatives <br /> 1) Award the contract to a higher bidder. Staff is confident the low bidder can <br /> complete the project. <br /> 2) Re-bid the contract. Staff does not believe a better price will be received through <br /> another bid. <br /> Fiscal Impact <br /> Funds have been approved in the FY 2003-2004 Capital Improvement Program, Tree <br /> Preservation and Sidewalk Repair funding in the amount of $1,000,000. $500,000 of this <br /> amount is earmarked for the streetscape (street trees and sidewalks) adjacent to the <br /> Cinema Project. The CIP budget contains the following balance: <br /> • Current project balance $ 945,094 <br /> • Current Wheel Chair Ramp Construction balance $ 50,000 <br /> � • 03-04 Subject Project -$ 569,652 <br /> • Project administration and inspection (remainder <br /> of FY 03-04) -$ 14.000 <br /> Estimated CIP balance at end of FY 03-04 $ 411,442 <br /> The $500,000 for the �Cinema Project (street tree / sidewalk portion) is included in this <br /> project balance amount. Staff will manage the 04-05 CIP budget to ensure the total <br /> amount is available for the Cinema Project streetscape when the pr.oject requires the <br /> funding. . <br /> � / / ;.. <br /> l <br /> N - ' �� <br /> Gordon Mann Peter Ingram Ed Everett <br /> Publie Works Superintendent Public Works Services Director City Manager <br /> Attachments <br /> Reporting Area maps <br /> Page 2 of 2 <br />