My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-06-14
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-06-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:46:17 PM
Creation date
6/11/2004 10:21:10 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> , {3'1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> June 14,2004 <br /> Subject <br /> Redwood City Recycled Water Project - Production and Delivery of Recycled Water <br /> Recommendation <br /> 1. Review principles of the proposed Agreement for Production and Delivery of <br /> Recycled Water ("Agreement") between the South Bayside System Authority and <br /> the City of Redwood City (Staff will provide additional information via a presentation <br /> on the implementation of the Recycled Water Project) <br /> 2. By Motion, request that the South Bayside System Authority Commission maintain <br /> current momentum of preliminary engineering design for Recycled Water <br /> Treatment, Disinfection, Storage and Pumping Facilities at SBSA, pending <br /> completion and approval of the Agreement <br /> Background <br /> In spring 2000, the City and SBSA began a demonstration recycled water program called <br /> the "First Step Project". The First Step Project consists of temporary treatment facilities <br /> and permanent buried pipelines that deliver recycled water to landscape customers <br /> immediately adjacent to the SBSA plant. The program was designed with the intent to <br /> provide recycled water for two to four years utilizing the existing temporary facilities with <br /> minimal modifications. It is now planned to operate through the 2005 irrigation season. <br /> Becaus~ water recycling is one of the most viable, near-term, water supply options that <br /> Redwood City is able to implement, the City embarked on the development and <br /> construction of a long-term, citywide recycled water system. In January 2002, the City <br /> Council accepted the Water Recycling Feasibility Study for the Redwood Shores. In <br /> August 2002 the City Council reviewed and accepted the final report - Water Recycling <br /> Feasibility Study for Redwood City. In the spring of 2003 City staff presented revised <br /> project alternatives that expanded the geographical area of the program in order to meet <br /> the goal of distributing 2,000 acre-feet per year of recycled water by 2010. At the same <br /> time, the City Council adopted a policy that precludes mandatory use of recycled water in <br /> existing residential areas. <br /> In August 2003 the City Council approved a broadly defined, flexible project, filed a <br /> California Environmental Quality Act Notice of Determination, and formed a citizen <br /> community task force to provide input on the implementation of the project. The Council <br /> charged the Task Force with the "goal to identify 1,946 acre-feet per year of potable water <br /> demand reductions by 2010, in a financially feasible manner, that avoids using recycled <br /> water at schoolyards, parks, and playgrounds". The Task Force completed their work in <br /> March 2004 and unanimously recommended that the City implement an alternative that <br /> through a combination of recycled water use, replacement of natural turf playing fields with <br /> synthetic turf, continued use of groundwater at Sequoia High School, and additional water <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.