My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-08-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2006 3:46:36 PM
Creation date
8/24/2006 12:05:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council & Redevelopment
Date
8/28/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 6.10 <br />Wagstaff and Associates Proposal for Services Page 11 <br />City of Redwood City Peninsula Park Project EIR Addendum Project <br />July 31,2006 Page 1-8 <br /> creek. and Bay water quality. Remaining hydrology and water quality mitigation <br /> requirements for the currently proposed Peninsula Park project will then be identified. <br />. Infrastructure and Public Services: The Addendum will describe the potential <br /> impacts of the Peninsula Park project on local municipal infrastructure and public service <br /> capacities and needs in comparison to the 2003 EIR project and 2003 EIR Alternative 6. <br /> The discussion will include comparative (reduced) municipal water demand impacts, <br /> sewage treatment and transmission capacity impacts, and project-related and <br /> cumulative impacts on police, fire protection, emergency medical, emergency access, <br /> parks, recreation and solid waste disposal services. <br />. Other Impacts: In addition to the key environmental issues listed above, the Addendum <br /> will describe the potential impacts of the Peninsula Park project in comparison to the <br /> 2003 EIR project and 2003 EIR Alternative 6 related to soils and geology (grading, <br /> dredging, differential settlement, and liquefaction), public health and safety (San Carlos <br /> Airport traffic), noise (freeway and aviation noise, construction period noise and ground <br /> vibration), cultural resources (disturbance of as yet unrecorded subsurface cultural <br /> resources) and air quality (construction period and long-term emissions). <br />1.5 ENVIRONMENTAL DOCUMENTATION OPTIONS <br />It appears at this preliminary point that preparation of an Addendum to the 2003 EIR will remain <br />the selected CEOA approach for the current Peninsula Park application, given the list of <br />environmental issues above and the low likelihood of new or substantial increases in impacts or <br />associated new mitigation requirements. If, during the course of the CEQA review, one or more <br />supplemental mitigation needs are identified to reduce an identified additional or more severe <br />impact to a less than significant level, preparation of a Mitigated Negative Declaration (MND) <br />rather than an EIR Addendum will be required. In the unlikely event that a new significant <br />unavoidable incremental Impact is identified, preparation of a Iimited~scope Supplement to the <br />2003 EIR (Supplemental EIR) will be required. <br />C:lDocuments and Sett/ngs'jelcasV..ocal SeltingslTeflVX)faIY Internet FileslOl.K5C\0602 proposal saction 1-rev.doc <br /> - <br />
The URL can be used to link to this page
Your browser does not support the video tag.