My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-08-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2006 3:46:36 PM
Creation date
8/24/2006 12:05:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council & Redevelopment
Date
8/28/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 6.1D <br />Wagstaff and Associates Proposal for servicePage 12 <br />City of Redwood City Peninsula Park Project EIR Addendum Project <br />July 31,2006 Page 2-1 <br />2. PROPOSED SCOPE OF SERVICES AND SCHEDULE <br />2.1 PROPOSED WORK SCOPE <br />The specific tasks and subtasks listed below are proposed to complete an EIR Addendum. The <br />ultimate document format (Addendum, MND or SEIR) will be dictated by the task findings. <br />Task 1. Attendance at Community Information MeetinQ <br />Wagstaff and Associates will attend one Community Information Meeting, jointly conducted by <br />the Redwood City Planning Commission and Architectural Review Committee, to receive input <br />on the proposed project and associated community concerns. <br />Task 2. Initial Meetin9s with City Staff and Aoolicant <br />Wagstaff and Associates will attend two meetings with City staff and/or the applicant to discuss <br />the current Peninsula Park application, the differences between the current application and the <br />2003 EIR project and 2003 EIR Alternative 6, and associated supplemental CEaA compliance <br />requirements, products, information needs, schedules, etc. <br />Task 3. Identification of Proiect Chanoes <br />Upon City acceptance of a complete Peninsula Park application package, Wagstaff and <br />Associates will review the 2003 EIR project and 2003 EIR Alternative 6 description materials to <br />identify and itemize the specific differences between the current Peninsula Park project and the <br />projects addressed in the City-certified 2003 EIR. <br />Task 4. Preoaration of Administrative Draft CEQA Document <br />An Administrative Draft Addendum to the 2003 EIR will be prepared with narrative, comparative <br />illustrations, comparative tables, and matrices which clearly and concisely describe: (1) the <br />project changes-i.e., the specific differences between the Peninsula Park project, 2003 EIR <br />project, and 2003 EIR Alternative 6; and (2) whether the certified 2003 EIR with minor <br />modifications adequately addresses the current project, or there are substantive new Impact <br />concerns or mitigation needs not already considered in preparing the 2003 EIR. For each <br />environmental topic considered in the 2003 EIR, the administrative draft CEaA document will <br />include a summary indication of how the project modifications and changes in project <br />circumstances since 2004 affect each impact and mitigation finding, and whether there are any <br />substantially new impact or mitigation findings not considered in the 2003 EIR. The <br />administrative draft CEaA document will contain only the information necessary to make the <br />2003 EIR adequate for the project as revised. <br />If the evaluation reveals the involvement of a new significant environmental effect or a <br />substantial increase in the severity of a previously identified significant effect, or if a new <br />mitigation measure is identified which is considerably different from those identified in the 2003 <br />C:lDocuments and Setlingsljek/l$lLocal SeltingslTempof8TY Internet FileslOLK5C\0602 proposal section 2.f8V.doc <br /> _. <br />
The URL can be used to link to this page
Your browser does not support the video tag.