My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2006-10-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2006
>
AgdaPkt 2006-10-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2013 11:45:25 AM
Creation date
10/5/2006 2:54:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council & Redevelopment
Date
10/9/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7A <br /> Page 1 <br /> R�P�'JRT <br /> To the Honorabte Ma�ar and City Counci# <br /> From the Ci Mana er <br /> o�to��r�, 2aas <br /> Subject <br /> Appr4val of Revised Str�ping Piarr ta add Bicycle Lanes an ir�dustriai Way <br /> Recommendation <br /> By motion, apprave a revised lane striping plan #hat includes bicycle lanes on lndustria! <br /> Way between Whippfe Avenue and the north City iimi#/San �arlos border. The revised <br /> striping plan wil! be incorparated as part of the 2005-2406 Street Overlay Project. <br /> Backgraund <br /> On September 11, 2Q06 the City Council awarded the construction con#rac# and <br /> approved the contract documents for the 2005-2006 Street Overfay Project. This <br /> project incfudes repaving and re-striping lndustrial Way b�tween Whipple Avenue and <br /> the north City limit/San Carlos border. <br /> Gurrentfy there are bicycle lanes on lndustrial Way to the north, in San Carios, which <br /> abruptly end at the Redwood City/San Carlos City limit line. This project offers a <br /> convenient opportunity to make changes to the [ane configuration to add bicycie lanes, <br /> with littie or no adciitional cost to the City, as the new surface must be re-striped <br /> anyway. <br /> On September 13, 2006, a community meeting was hosted by the Redwood Cify <br /> Gommunity Workirtg Graup on Bicycle & Pedestrian tssues; and facilitated by Gity staff <br /> and the Peninsula Conflict Resolution Center (PCRC), to present and discuss two <br /> propased lane configuration aI#erna#ives that would add bicycEe lanes on this segment <br /> of Industrial Way. Meeting notices were maifed out to �esidents and businesses in the <br /> area bordered by Whipple Avenue, Veterans Botaievard, the north City limi#, and Lenolt <br /> Street. Additionaliy, the Bicycle & Pedestrian Group distributed flyers door-to-doar to <br /> residences in the area bordered by Whipple Avenue, Lenolt Street, the north City/San <br /> Carlos border, and Stafford Street (Notification area map attached). This meeting was <br /> attended by twenty-one (21) members of the public, as weN as t�ree members of City <br /> staff, and three PCRC facilitators. A summary report of this meeting prepared by <br /> PCRC is attached for reference. <br /> The addition of bicycle lanes on this segmen# of Industriai Way will senre a key portion <br /> af the County-wide bicycle plan's North-South Bikeway, axtending the existing bicycle <br /> lanes in San Carlos south to Whipple Avenue, and bike lanes could eventually extend <br /> sauth of Whipple Avenue along Winslow Street, providing a connection to the <br /> dawntown area. The additian of bicycle lanes will involve coilabarat9on with the City of <br /> San Carios, in order to transition between the existing bike iane confiiguration in San <br /> Carlos and the new proposed lane ca�guration in Redwood City. City staff are <br /> coordinating this transition #a the proposed bike lane plan with San Carlos staff. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.