Laserfiche WebLink
i � <br /> _-___ � �3� <br /> ° — — DRAFT <br /> ix) �veloper s'�U pe�ll� are and distribute Change Order Reports during the <br /> Constru�P efi".�e, begin�fer the firstchange order is approved. The repat shall list all <br /> appr�t'change�ers by rmmber, a brief description of the change order work, a proposed <br /> — ass�gdment of res�nsibility foBbe cost of the change order, the cost established in the change <br /> order�_per the change order work. <br /> C. �:"onsWction Ad�ininisVation <br /> —' � B� allowing any Contractor to begin woric, Developer sh�:ll verify that the <br /> �— Contrado�s secvmd the required building pertnits, bonds, insurance, IaLor affidavits and <br /> — waivers. — ' <br /> — ii) �eveloper shall provide all testing and inspection services required for the Project <br /> thno Consukants acceptable to Ciry and Agency. <br /> m) Developer shall provide all of the construction administraGon services typically <br /> performed by the design professional (including but not limited to interpretation of the Construction <br /> Documents, reviewing and taking appropriate action on Contractor submittals, response to <br /> contractor requests for infortnation, and assessment of proposed material or equipment <br /> substitutions) through appropriate Consuttants acceptable to City and Agency. <br /> iv) Developer shall coordinate all technical inspection and testing required for the <br /> Project. Developer shall be provided a copy of all inspection and testing reports on the date of the <br /> inspection or test. <br /> v) Developer shall review proposed substitutions for specified products or equipment for <br /> the Public Parking Facility with the design consultants and shall prepare and present <br /> recommendations to the City and Agency on acceptance of the proposed substitution in report <br /> form. Developer shall not allow the contractors to make any substitutions that wiil affed the Public <br /> Parking Faciiity without written approvai from the City and Agency. <br /> vi) Developer shall review the contents of requests for changes to the conUact time or <br /> _. price submitted by a Contractor, assemble information concerning the request and endeavor to <br /> determine the cause of the requests. If Developer believes that the requested change may affect <br /> the Project schedule and/or require the City and Agency to increase their financial contributions to <br /> the Project, Developer shall prepare and submit to the City and Agency a written analysis of the <br /> proposed change and a recommendation with respect to acceptance of the request. <br /> vii) Developer shall review the payment applications submitted by each ConVador and <br /> Consultant and determine whether the amount requested reflects the progress of the Contractors <br /> or Consultant's work. Developer shall make appropriate adjustments to each payment application <br /> and shall prepare and forvvard to the City and AGency a progress payment report. The report shall <br /> state the total contract price, payments to date, current payment requested, retainage and actual <br /> amounts owed for the current period. Included in this report shalt be a Certificate of Payment that <br /> shall be signed by the Developer and delivered to the City and the Agency. <br /> . FormatEed: WM:9Gt <br /> oabced: ssenv�o ��esr000� <br /> 9'26!03 31 <br /> I, :�`.'%�.ir33'86'OOOL _.... . ........__.__-_�_�___..'_.___.._.__.._._._..__.________________________f <br /> DBB 100903/Agr.147 <br /> _--_____. . <br />