Laserfiche WebLink
�j � -� EXHIBIT "B" <br /> l�� ON BROADWAY - PARKING GARAGE <br /> CLARIFICATIONS & EXCLUSIONS <br /> 1 of s <br /> CSI # DESCRIPTION CLARIFICATION <br /> 1710 CLEANUP • Periodic construction cleaning is included. <br /> • Final construction c(ean consisting of broom clean floors, wet mop of <br /> VCT, dust and wipe down of doors and finished suifaces, cleaning of <br /> lass and removal of own debris. <br /> 2010 SURVEY . Include horizontal and verdcal control of construction _s included <br /> based on Owner furnished survey and contro) plan. <br /> • As built surve s to be rovided for ile locations and site utilities. <br /> 2060 DEMOLITION . Demolition and removal of sidewalk and pavement of Middlefieid <br /> Road to edge of curb on west side of street for excavation of Parking <br /> Garage from grid line 10-11 / A-R is inciuded in [he Garage GMP. <br /> • All other demofition required for construction of building above and <br /> sidewalks is excluded from Garage Contract but included as patt of <br /> Site & Building Budget. <br /> • Demolition of areas outside curb at Broadway, Jefferson and <br /> Middlefield (excep[ for area required for gaza�e construction) is <br /> excluded. <br /> • Salvage or special handling of materials is exciuded. Assume all <br /> stored materials in buildings, parking me[er heads, etc. ro be removed <br /> by others prior to Notice to Proceed. <br /> • Removal and delivery of City streetlights traffic and cross walk <br /> � signals co RWC Public Works yard is included. <br /> I • Subconvacror bond for demolition is excluded. <br /> I ' Demolition is based on a continuous and uninterrupted flow of work <br /> over the entire site. Impacts for delays to access areas of work or <br /> buildinas are not included in the GMP. <br /> :104 I DEV�'ATERING • GMP is based on drilling and removing 32 temporary dewatering well <br /> � based on our review of Ihe Soils report and normal climatic <br /> ' conditions. <br /> ' • The possibility of subsidence occurxing on this prqject properry and / <br /> I or adjacent properties during or subsequent to dewatering operations <br /> , is impossible to predict. The Owner shall indemnif}' and hold Wentz <br /> Group harmless from all ]iability, loss, claim, demands and costs, <br /> i including atrorney's fees and applicable interest, rising from any <br /> , subsidence occurring or alleeed to occurred by reasons of dewaterin� <br /> activi[ies covered in this contract. <br /> � • GMP is based on one mobilization for installation of dewatering <br /> � system. <br /> i • Handlino for excess water is excluded. ' <br /> � • Handling, monitoring, treatment and disposa] of contaminated water <br /> i ue excluded. <br /> • Bond for dewaterino subcontractor is included in the GMP. <br /> =1�0 � 5HORING • Provide temporary perimeter shoring full height of excavation using <br /> i drilled-in-place beams 2 rows of external tiebacks and aeated wood <br /> i lagging. <br /> i • Shoring [o be "Design Build" based on design criteria provided by the <br /> Geotechnical Engineer. <br /> ! • 3horing to be installed at "Property Line" of building that wil] require <br /> ! an L shaped footing in lieu of T footing currendy shown, It is the <br /> ' intent to apply waterproofing duecdy to the laggin_ �nd air-place <br /> , (shotcrete) concrete for perimeter below grade wafls. <br /> ' • Owner / RWC to rovide all shorin and tieback a�reements, <br />