EXHIBIT "B" � . � �3�- <br /> ON BROADWAY - PARKING GARAGE <br /> CLARIFICATIONS & EXCLUSIONS <br /> 2 of s <br /> including those for businesses on west side of Middlefield / Theater <br /> T Way. <br /> • Soldier beams, tiebacks and lagging to be left in place after <br /> construction except for designated locations for future utility tie-in. <br /> Tiebacks will not be de-tensioned but will loose effectiveness over <br /> time and are not permanent. <br /> • Winterization costs for shoring are not included in the GMP. <br /> • Shorin; is based on a continuous and uninterrupted flow of work over <br /> the entire site. Impacts for additional move ins or delays to access <br /> areas of work or buildings are not included in the GMP. <br /> • Bond for Shorin subcontractor is included. <br /> ?230 GRADING & • All grading and paving work is excluded from the Scope of Work and <br /> PAVING is to be accomplished under the Site Contract or by RWC (see below). <br /> • All new paving, decorative pavers, resurfacing or patchin; at <br /> Broadway, 7efferson or Middlefield Road / Theater Way is excluded <br /> and to be b others. <br /> 2235 � MASS • Mass excavation based on cut of 23'-3" from existing grade to bottom <br /> EXCAVATION of base rock as noted in plans. Over excavation below elevation of <br /> subo ade is excluded. <br /> � • Excavation is based on use of shoring and ]agging at building line and <br /> I shoterete or one-sided forms. Over excavation or backfill beyond line <br /> of building is excluded. <br /> • Temporary access ramp into excavation for trucks, equipment and <br /> ' cranes through svuctural steel erection. <br /> i • Assume that new concrete culvert installed by others will support <br /> ' (afrer 27 day cure time) equipment loads for all vades needing access <br /> to lower level of garage including pile zig, excavation equipment and <br /> -- trucks, concrete and pump �ucks, rubber tired crane for steel erection, <br /> eu. <br /> • Demolition of existing box culvert to limits of excavation is included <br /> � i in Mass Excavation. <br /> • Filling of existing culvert beyond limits of work is excluded. <br /> '� • Mass excavation is based on a continuous and uninterrupted flow of <br /> I work over the entire site. Impacts for delays to access areas of work <br /> aze not included in the GMP. <br /> �I • Impacts for adverse winter conditions, mud removai, contaminated <br /> soils; archeolo�ical finds, etc. are excluded. <br /> I j • Bond for Earthwork subcontractor is included. <br /> '355 �, PILING • 15 —55' indicator piles are included. <br /> 'I • We assumed one mobilizadon and continuous tlow of work with one <br /> ; rig using normal work hours (OT is exc]uded). <br /> • We have included the following pile quantity and ]ength: <br /> � • 327 12" SQ PCP's @ 45' <br /> ' • 446 14" SQ PCP's @ 45' <br /> ' • 120 18" SQ PCP's C� 45' <br /> • Pile cap connection exposed strands. <br /> � • Included pre-drilfine. <br /> I • Subcontracror bond is included. <br /> I • Pile cut-offs are excluded. <br /> I . Piles at perimeter continuos foorings are excluded. <br /> • Schedule based on using one pile-driving rig. <br /> I • Noise and vibration monitorin is excluded. <br />