Laserfiche WebLink
� �• �^� EXHIBIT `B" <br /> ON BROADWAY - PARKING GARAGE <br /> CLARIFICATIONS & EXCLUSIONS <br /> 3 of 8 <br /> 2470 SITE • All site furnishings including planters, benches, trash recept; <br /> FURNISHINGS urns, tree grates, decorative columns, bike racks, etc. is excl� <br /> • City of Redwood City to temove and replace all parking meters <br /> azea of work and storase. <br /> :480 LANDSCAP$ & • All landscape, pianting, trees, planters and irrigation work inclu <br /> IRRIGATION sleevos is excluded. <br /> 250� SITE CONCRETE • All site concrete inciuding curb, curb & gutter, walks, decoratir <br /> concrete paving, planters, seat wall, pavers at Theater Way, <br /> Broadwa & Jefferson is excluded. <br /> 2580 STRIPING / • Striping, arrows, painted handicapped loocs, and handicapped F <br /> BUMPERS stall signs are included. <br /> • Precast vehicle wheel stops are excluded. <br /> • Diagonal stripine is exc]uded. <br /> • Bond for stri in� subcontractor is excluded. <br /> 2590 ART • Artwork is excluded. <br /> 2710 LTIv'DERGROUND • Domestic Water: <br /> UTILITIES • We have included 1— 1" domestic water service with back <br /> device for �arage. <br /> • Relocation of water in Thea[er Way is excluded. <br /> • Fire Water: <br /> • Provided 1- 8" fire connection at Broadway <br /> ■ Provide 1 — 8" SDCV <br /> • Provide 1— 8" x 4" FDC <br /> ■ Flush & hydro test <br /> • Storm Drain: Storm drain work for eazase is excluded or not <br /> applicable. All connections to garage aze through sanitary sP <br /> • Sanitary Sewer: <br /> ■ We have provided a G"connection and clean out for the G< <br /> ■ Relocation of sanitary sewer in Theater Way is excluded. <br /> ' • Relocation of 5BC phone duct, power, gas, cable TV, fiber opt <br /> water, storm or sanitary sewer or new joint utility uench in Cit <br /> i re uired for com letion of On Broadwav is excluded. <br /> 3100 STRUCTURAL • 4" base rock below SOG is included assumed 1166 tons. <br /> CONCRETE . Assumed 3,000 PSI concrete for pile caps & grade beams. <br /> • Assumed 873 EA epoxy coated pile dowels. <br /> • Assumed 1,224 ton of reinforcin� stee] in gazage svuctural cor <br /> • Assumed shear studs at column locations. <br /> • Assumed no welding of rebar or shear studs at deck / column <br /> intersection; steel to be punched in shop to allow rebar to pass <br /> throueh. <br /> • Assumed stabilizer steel to be remain in podium deck. <br /> • Assumed 3,000 PSI concrete at 1�" SOG and footings. <br /> • Assumed 4,000 PSI concrete at 10" elevated decks. <br /> • Assumed L shaped perimeter continuous footina in lieu of T fi <br /> to allow use of shotcrete or one-sided form directly to lagging. <br /> • We retain the option to use shotcrete or one-sided formed wall <br /> perimeter shear walls. <br /> I • Columns to 6e 3.000 PSI concrete encasing structural steel. <br /> • Finishes: <br /> I • Garage: Swirl. <br /> I ■ Walls: If shotcrete float finish, if CIP off form finish with <br /> i air ocke[s patched. <br />