My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-10-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-10-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:40:09 PM
Creation date
10/9/2003 3:26:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
10/13/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� • ��� EXHIBIT �B" <br /> ON BROADWAY - PARKING GARAGE <br /> CLARIFICATIONS & EXCLUSIONS <br /> 7of8 <br /> • Provide fire / smoke dampers as required at fan rooms. <br /> • Provide grill and grates as required for exhaust and make up air <br /> systems. <br /> • Bond for HVAC subcontractar is included. <br /> 16000 DESIGN BUILD • Provide primary conduits to now PG&E vansformer vault from a new <br /> ELECTRICAL PG&E installed splice box locat°d at Broadway & Jefferson. <br /> • Provide secondary conduit and wire to new service gear and meter <br /> socket for Gazage in separate electrical room. <br /> • Provide surface mounted garage fixtures to provide illumination of 5 <br /> fc / SF. <br /> • Fixtures at Attendant Office, Restroom, stairwells and elevators to be <br /> � surface mounted fluorescent. <br /> • Provide analog addressable fire alarm system. <br /> • Provide emergency generator (location to be determined) for <br /> emergency lighting and exhaust system. Since iocation has not be <br /> determined costs for fuel piping and exhaust have not been included. <br /> Please note that generator is not required by code and will be replaced <br /> ��� by battery pack emergency lighting and credit offered for generator. <br /> ; • Provide power for exhaust systems and HVAC equipment. <br /> • Provide power for sump pump. <br /> • Provide power and liohting for Attendant Office and parking <br /> i equipment (one point connection). <br /> � • Conduiu, multiple connection points, low voltage controls, etc. for <br /> �! Pazking Control equipment is excluded. <br /> • Provide conduit only for phone to fire alarm, Attendant Office, Code <br /> Blue and elevator communication. Wire; phone service and <br /> i monitoring by others. <br /> ' � • Provide emereency help stations (Code Blue) consistin� of two-way <br /> � intercoms to Attendant O�ce and blue strobe lights with internal <br /> ' camera at each uni[. Help stations to be located in center of parking <br /> j isle within 100' — 125' of max travel. <br /> j • Provide video surveillance system ucilizing of fixed color cameras. <br /> � Video feed to termina[e at Attendant's Off`ice and will be provided <br /> � with digital video recorder with rapid playback and 30 days of digital <br /> I storage. Cameras to be provided at help stauons gazage envance and <br /> i e�cit, outside of each stairwell at each level. Cameras at help stations <br /> will only record when activated. Functional criteria for recording for <br /> entrances and stairwells needs to be mutually established to mee[ <br /> needs of operator and budget. <br /> ! • All PG&E primary cable, splice box vault and installation, • <br /> i transformer, engineering and connection fees are exciuded. <br /> , • Any decorative or accent lighting are excluded. <br /> • Sond for Electrical subcontractor is included. <br /> j SITE LOGISTICS • Assumed Broadway, Jefferson and Middlefield (east side) sidewalks <br /> to be closed for duration of the project. <br /> � • Temporazy fence to be installed at curb line of Broadway, )efferson <br /> and West side of Middiefield with Middlefield closed to all traffic for <br /> i duration of project. <br /> I i <br /> • Assumed sufficient area for GC and subcontractor trailers, material <br /> i deliveries, shake out and lay down area, etc. on lot 2 parking lo[ south <br /> � of project. This space to be used solely by Wentz for duration of <br /> i entire project at no cost. <br /> • Assumed reasonable lane closures on surroundin� streets for durntion <br />
The URL can be used to link to this page
Your browser does not support the video tag.