My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-12-06
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:55:51 PM
Creation date
12/2/2004 3:58:11 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
12/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� 5� 1 C-Z8 - <br /> � SCHEDULE AND COST, con� <br /> � J. Budget <br /> At your direction, we have reviewed and revised our budget to include more time for preparation of <br /> � the Final EIR, two more meetings/hearings, and time for the noise consultant to attend one hearing. <br /> . With these additions to the scope, the cost to prepare the EIR is estimated not to exceed a maximum <br /> of $159,088. All costs would be charged on a time and materials basis, and commensurate with work <br /> completed, in accordance with the attached fee schedule. If we do not need all the rime that has been <br /> budgeted, we will only bill for the time that is actually spent completing the work. Payment will be <br /> due on a monthly basis. A breakdown of the EIR cost estimate is provided below and a detailed <br /> budget estimate, broken down by task, is provided on the next page. It should be noted that the <br /> attached budget is for estimating purposes only and not for contractual putposes. We propose to <br /> prepare the EIR for the not-to-exceed fee, based upon our current understanding of the project and the <br /> scope presented herein. The time required for some tasks may be longer and the time required for <br /> other tasks may be shorter. <br /> DJP&A Costs to Prepare EIR .........................................................................$86,270 <br /> In-house Hours $ ��� <br /> (Assumes approx. 366 Snr. PM, 72 Principal, 92 Assis. PM, & 32 Graphic Artist hours) <br /> Graphics, PDF CDs, Maps & Mileage $1,000 <br /> Reproducrion $8,000 <br /> (Assumes 15 ADEIRs, 50 DEIRs w/ 2 volumes, and 50 FEIIts) <br /> S ubconsultants� ..........................................................................................$72,818 <br /> Traffic Impact Assessment (Fehr & Peers Associates, lnc.) $48 093 <br /> Air Quality Assessment (Don Ballanri) $5,175 <br /> Noise Impact Assessment (Illingworth & Rodkin) $7 475 <br /> 4 Photosimulations (Previsualiscs) $11,5003 <br /> Cultural Resources Records Search (Holman & Assoc.) 575 <br /> Total Estimated EIR Budget $159,088 <br /> Notes: �Subconsultants and expenses include a 15% administrative mark-up. <br /> Z Fehr & Peers ' cost estimate includes recommended driveway counts and parking surveys. <br /> Without these tasks, the price for the traffic impact assessment would be $42,872. <br /> 3 Previsualists costs could be as low as $4,600, depending upon the vantage points selected <br /> and their proximity to the project, and ease of use of the project 3-d model. The cost estimate <br /> includes the not-to-exce�d fee; but we will only charge for the time needed to complete the <br /> work. <br /> Sequoia Hospital Campus Project/Precise Plan EIR Scope of Services <br /> David J. Powers & Associates, Inc. Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.