� 5 � C� <br /> 2� <br /> � SCHEDULE AND COST <br /> � An estimated schedule for completion of the EIR is provided below. Under this schedule, <br /> completion of the EIR would take approximately 37 weeks. It is tuilrnown at this time the exact <br /> riming of preparation of the Precise Plan. DJP&A can commit to maintaining the schedule in the <br /> � areas which aze within our con�ol. A corresponding slip in the schedule would occur, however, as a <br /> result of unanticipated delays beyond our control, including failure to receive project-related <br /> information in a timely manner, delays in administrative reviews, continuances of public hearings, or <br /> � similar events. <br /> SEQUOIA IiOSPITAL CAMPUS / PRECISE PLAN EIR <br /> � O timum Schedule <br /> Task/Product Completed <br /> at End of Week <br /> � Receive Authorization to Proceed � <br /> Receive preliminary project plans, geology report, Hazardous Materials Week 1 <br /> � information and Phase I R orts <br /> DJP&A submits Adaun. NOP and Initial Study (IS) to City for Review. Week 3 <br /> City reviews NOP and IS and provides comments to DJP&A Week 5 <br /> � City completes Draft Precise Plan, DJP&A receives detailed project plans, Week 6 <br /> arborists report, landscaping plans, engineering info, computer model of <br /> � buildin s. Ci & DJP&A select vanta e oints for Photosimulations. <br /> Admin. Draft Traffic Report Completed. Week 7 <br /> DJP&A revises NOP and submits to Ci for ublic dishibution <br /> Air Quality, Noise Impact Report and Photosimularions completed. Week 10 <br /> � Precise Plan complete, including Design Guidelines Week 11 <br /> DJP&A submits admia. ADEIR to City for review Week 13 <br /> � City reviews Admin. Draft EIR Week 17 <br /> 1 Revise ADEIR per City comment, submit Screencheck Draft EIR Week 19 <br /> � City reviews Screencheck Draft EIR Week 21 <br /> Revise per City comments, print and submit copies to City for public review Week 22 <br /> End DEIR 45-day review period Week 28.5 <br /> Prepare Administrative Final EIR Week 32 <br /> Assumes no new technical information re uired <br /> City review of Final EIR Week 34 <br /> Revise Admin. FEIR per City comments, print, and submit for City Week 35 <br /> distriburion to ublic <br /> Complete 10 day FEIR circularion Week 37 <br /> TOTAL DLTRATION OF EIR PROCESS 37 WEEKS <br /> Sequoia Hospital Campus Project/Precise Plan EIR Scope of Services <br /> David J. Powers & Associates, Inc. Page 15 <br />