My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-05-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2012 12:59:01 PM
Creation date
5/19/2005 3:54:57 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/23/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6:/£-6 <br /> <br />Historic Courthouse Reconstruction <br />May 3, 2005 <br />Page 2 of4 <br /> <br />2. Review submittals, shop drawings and samples for conformance with the approved <br />design concept of the Project, and for compliance with the information given in the <br />construction documents. <br />3. FRP Process: Review and evaluate the results of the sculpting of the special <br />reconstruction features required by the project. Include reviews of the fi:1al mock-ups <br />prior to fabrication. Maximum of (2) visits to the fabrication facility. <br />4. Review and respond to Requests for Information (RF"s) <br />5. Observe the quality of the work, and endeavor to guard against defects or deficiencies. <br />Such observations will be conducted in conjunction with the periodic OAC meetings. <br />6. Provide a final site visit to establish date of MSubstantial Completion". Prepare and issue a <br />punch list specifying the work to be completed and / or corrected before final payment is <br />issued. <br /> <br />Construction Closeout Phase <br />1. Prepare architectural record documents upon receipt of as-built information from general <br />contractor. Changes shall be compiled from a paste-up of field issued information. New <br />CAD work is not included, <br /> <br />ENGINEERING CONSULTATION <br />To be provided per attached proposals: <br />1. Structural: DES <br />2. Electrical & Plumbing: Alfa Tech, Inc. <br /> <br />SCHEDULE <br />Refer to the attached Project Sc:'edule. <br /> <br />ASSUMPTIONS <br />The following assumptions form the basis of this proposal: <br />1. No changes to the previously approved construction documents, which includes city plan <br />check process. <br />2. All DES work, and related responsibilities, will end prior to start of the work on the plaza. <br />3. The plaza work will conform to the reconstruction work, wherever possible. <br />4. Our fee is based on the period of time shown on the Project Schedule. <br /> <br />EXCLUSIONS <br /> <br />The following services are not included in our Basic Services fee, but can be provided on a <br />negotiated fee or time and expense basis per the attached Schedule of Charges. <br />1. Discovered conditions in the field that result in: <br />. Extensive investigation <br />. Modifications to the documents <br />. Changes to the design <br />. Reconciliation of dimensions per existing conditions <br />2. Plaza related work. <br />3. Security and telephone - data design <br />4. Building permit application fees <br />5. Coordination of bidding process, except as included in scope of work <br />6. Artwork selection or placement <br />7. Signage, other than code required signage. <br />8. Removal or assessment of hazardous materials <br />9. Testing and inspection fees during construction <br /> <br />DES Architects + Engineers, Inc. <br /> <br />M: \ Oppty \ 2005 \ City of Rnuood City \ SMC-HCR 2005 \ Fi",,¡ Fites \ HCR-arch-proposal- <br />050305.doc <br /> <br />~2003 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.