Laserfiche WebLink
CLEAN LAKES INC. <br /> 2a- Monthly Usage Reports: $350.00 flat rate per monthly report <br /> 3a- Annual Report: $800.00 flat rate per annual report <br /> 4a -Other anticipated costs (Lab Fees): <br /> o (7) N & P Samples $336.00 <br /> o (2) Coliform Samples $120.00 <br /> • Based on the above, the monthly monitoring costs for the five (5) sites would be <br /> $2,309.44. <br /> Task 2 — Water Quality Monitoring — Pesticide Application Monitoring: <br /> 2a- Monthly sampling and monitoring: $318.00 hourly rate <br /> 2b- Monitoring Record Keeping: $ 56.70 hourly rate <br /> 2c- Monthly Pesticide Usage Report: $100.00 flat rate per report <br /> 2d- Annual Report: $800.00 rate per report <br /> 2e- Other anticipated costs (Lab Fees): <br /> o Hardness $34.00 <br /> o Copper $22.00 <br /> o Diquat $178.00 <br /> • Based on the above, one annual monitoring event to cover 10 pesticide applications for <br /> submerged aquatic plant control is projected with an annual cost of $4,297.80. <br /> • Based on the above, two annual monitoring events to cover 20 pesticide applications for <br /> algae control are projected with an annual cost of $6,459.60 ($3,229.80 per event). <br /> Task 3 — Coordination with Analysis Lab, Lagoon Maintenance Contractor, and the City: <br /> 3a- identify, coordinate /liaison with qualified testing laboratory, including assuring laboratory <br /> meets EPA requirement: $110.00 hourly rate <br /> 3b- Coordinate with City's maintenance contractor to assure both pre and post treatment testing <br /> is completed according to plan: $110.00 hourly rate <br /> 3c- Other anticipated costs (Travel): $0.50 per mile <br /> • Based on the above, it is estimated that approximately twelve (12) hours per year will be <br /> required for coordination with an annual cost of $1,320.00. <br /> Task 4 — Update Redwood Shores Lagoon Management Plan (RSLMP) as needed: <br /> 4a- Coordinate with City staff to update the plan: $1 10.00 hourly rate <br /> 4b- Other anticipated costs: $ <br /> • Based on the above, it is estimated that approximately ten (10) hours per year will be <br /> required for coordination with an annual cost of $1,100.00. <br /> Analysis /Service Monthly or Event Costs Annual Cost <br /> Task 1: WQ Monitoring $2,309.44 x 12 $27,713.28 <br /> Task 2: Pesticide Monitoring <br /> • Plant Control $4,297.80 x 1 $4,297.80 <br /> 2011 Redwood Shores Lagoon Water Quality Monitoring Proposal <br /> Page 14 of 18 <br /> General Services Agreement between the City of Redwood City and Clean Lakes, Inc. - Exhibit A 07/01/2011 <br /> Page 10 of 13 <br />