Laserfiche WebLink
the method for ensuring the mitigation, if appropriate. The MMRP will be provided prior to approva] <br /> of the project. <br /> MEETiNGS <br /> This scope of work assumes that t6e Project Manager will attend Planning Conunission. Additioval <br /> meetings may be a,dded on a time and materials basis. <br /> SCHEDULE <br /> DJP&A proposes tl�e following optimum schedule for preparation of the IS. DJP&A can commit to <br /> maintaining the schedule in the areas that are wiUiin our controL Based on this schedule, the <br /> environmental review process would take approximately 12.5 weeks. Delays in receiving requested <br /> information or responses (lis[ed above) by others wil] result in at least day-for-day delays in the <br /> overall schedule. <br /> Valota Road Residential Project <br /> O timum IS Schedule <br /> Task Completed at the <br /> end of week <br /> Receive Authorization to Proceed and City Planniiig Staff Approves Scope of <br /> Work <br /> DJP&A Receives All Pro'ect Information Re uested from a licant* Week 1 <br /> DJP&A Com letes Administrative Drafr IS Week 5 <br /> Cit Review of Admin. Draft IS coui leted Week 7 <br /> DJP&A Revises 1S and Provides Screencheck Co ies to Cit of Redwood Cit Week 8 <br /> Cit of Redwood Cit Reviews Screencheck IS, A roves Re roductiou Week 9 <br /> DJP&A finalizes IS and submits to City for circulation Week 9.5 <br /> Initial Stud and Miti ated Ne ative Declaration Circulates for 20 da s Week 12.5 <br /> Plannin Commission Hearin >12.5 weeks <br /> * Crrfical I�ems to be provided by applicant include the site plans witli building elevations, water <br /> quality and hydrology information, Geotechnical Report, Phase 1 ESA, and Arbonst Report. <br /> � Valota Residential ProjeG Page 5 <br />