My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
07/30/03 16:03 FAX 415 291 9533 Freedman Tung & Bottomle <br />EXHIBIT A <br />Scope of Services, Page 5 <br />A. Finalize urban design and revitalization strategy (text and diagram) <br />B. Refine/modify redevelopment concept p'sn for Station A.ea <br />C. Refmdmodify land use planting areas diagram <br />D. prepare preliminary development standards, preservation & public benefit incentives <br />E. Prepare parking recommendations (based on City staff/consultant recommendations) <br />F. Prepare two residential MF prototypes to illustrate development standards <br />G. Finalize street network changes and CalTrain Station Area circulation plan <br />H. Finalize conceptual streetscape plans for Broadway (from Cinema block design) <br />I. Finalize conceptual stmetscape plans for cinema blocks: Jefferson, Theater Way <br />J. Refine conceptual stmetscape plan for Winslow, station area realigned streets <br />K Prepare capital improvement and implementation program recommendations <br />Task 7. Community Review to Refine Preferred Plan Concepts <br />A. City Staff Review Session-in Redwood City (same day as workshop) <br />B. Revise drawings and presentation to respond to comments at City Staff Review Session <br />C. Meet with City Project Manager in Redwood City (same day as workshop) to coordinate <br />presentation <br />D. Community Workshop #3 - Refine Preferred Plan Concepts <br />1. Prepare presentation and workshop materials; logistics coordination <br />2. Attend, set up, facilitate discussion, record comments <br />E. Revise deliverables as directed <br />Boos <br />/ /.A -7 <br />Task S. joint City Cotmal &Planning Commission Study Sessions (Hearing #1) <br />Report back to City Council and Planning Commission on the results of the concept development phase of the <br />project. Present key consultant recommendations as well as a review of primary community workshop participant <br />input. including instances in which consultant recommendations differ with workshop participant Preferences. Given <br />that the preceding community workshops have provided opportunity for public inpuC the intent of the Study Session <br />would be to allow the City Council and Planning Commission to have an opportunity to have a discussion with the <br />consultants, to be able to ask questions, and provide additional direction to the consultants. <br />A. Prepare presentation and workshop materials <br />B. Attend Study Session - Presentation, Q&A, discussion, record direction <br />Task 9. Prepare Final Muslrations <br />Finalize plan concepts to reflect community and City staff input, as well as changing conditions, in order to develop <br />a final package of recommendations and illustrations that summarize the selected direction for Downtown. <br />A. Finalize land use planning areas diagram & use intensity concepts <br />B. Refine preliminary development standards, preservation & public benefit incentives <br />C. Refine parking recommendations (based on parking consultant recommendations) <br />D. Finalize conceptual streetscape plan for Broadway <br />E. Finalize conceptual streetscape plan for Winslow & Hamilton streets <br />
The URL can be used to link to this page
Your browser does not support the video tag.