My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ito ✓./ <br />vii) Each month, Developer shall review the progress of construction of <br />each Contractor, shall evaluate the percentage complete of each construction <br />activity as indicated in the Contractor's construction schedule and shall review <br />such percentages with the Contractor. This analysis shall serve as the basis for <br />the progre.:s payments to the Contractor. Based on this information, Developer <br />shall provide a written report to City and Agency, no less often than monthly, <br />showing the actual progress compared to scheduled progress, payments made <br />on account of construction, change orders requested ancLissued, changes to the <br />projected cash flow schedule, and informing the CityAff of any events <br />that may affect the cost or schedule for constructi Public Parking Facility <br />and the Project. <br />viii) The Developer shall prepargr distri e� monthly progress <br />payment reports. These reports shall statd3kfe total of the Ping Facility Costs, <br />the value of all contracts for constructio Public Parking1j�iality, payments <br />made by Developer to date for Ong Facili r Costs, cum payments <br />requested by Contractors and Consultants, an bests for distrlF7tion of the <br />Contingency Funds, retainage held or c ontract, and actual amounts <br />Developer proposes to p anto Contract5t%E:ffnd Consultants in the current <br />payment period. This report include a L&tificate of Payment that shall be <br />signed by the Developer and th e Cad Agency for use in making <br />reimbursements to the Develops <br />ix) D all per idic y prepa�nd distribute Change Order <br />Reports duri <br />*09 e Cons'ction P arose, beginning after the first change order is <br />approved. a report s list all a)oroved change orders by number, a brief <br />descriptionf Chan rder work, proposed assignment of responsibility for <br />the cost of tfi�a cost= established in the change order and <br />percent of comp the chap War work. <br />C. <br />i) Befii w allo�ngn ' any Contractor to begin work, Developer shall <br />verify. that the Cola - ctor has secured the required building permits, bonds, <br />insurance, labor of l vits and waivers. <br />' . `toper shall provide all testing and inspection services required <br />for the ProjeVrough appropriate Consultants acceptable to City and Agency. <br />iii) Developer shall provide all of the construction administration <br />services typically performed by the design professional (including but not limited <br />to interpretation of the Construction Documents, reviewing and taking appropriate <br />action on Contractor submittals, response to contractor requests for information, <br />and assessment of proposed material or equipment substitutions) through <br />appropriate Consultants acceptable to City and Agency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.