My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 -? <br />iv) Developer shall coordinate all technical inspection and testing <br />required for the Project. Developer shall be provided a copy of all inspection and <br />testing reports on the date of the inspection or test. <br />v) Developer shall review proposed substitutions for spec:fiEd <br />products or equipment for the Public Parking Facility with the design consultants <br />and shall prepare and present recommendations to the City and Agency on <br />acceptance of the proposed substitution in report form. Developer shall not allow <br />the contractors to make any substitutions that will-AgFFmt the Public Parking <br />Facility without written approval from the City and AgW. <br />vi) Developer shall review the conteri�f re'q�ts for changes to the <br />contract time or price submitted by a�-6ntractor, assemble information <br />concerning the request and endeavor tomine the caus�the requests. If <br />Developer believes that the requested- EtaWnge may affect the% ect schedule <br />and /or require the City and Agency t63ncrease the contributions to the <br />Project, Developer shall prepare and�bmit to and Agency a written <br />analysis of the proposed change an � mmendation with respect to <br />acceptance of the request. — <br />vii) Developer shall [8yieuv oayme6fiigplications submitted by each <br />Contractor and Consultant a4 M38mount requested reflects <br />the progress of ths_ntractor'sor Cons - o�t_s_ w(3rk. Developer shall make <br />appropriate adjustments =to eacFi�a7 — bnt al3 rcation and shall prepare and <br />forward to the City and Agency a progress payment report. The report shall state <br />the total contract price, p�ments to-date, current payment requested, retainage <br />and actual amounts oweddor the current-period. Included in this report shall be a <br />Certificate of Payment =that shalt be Vned by the Developer and delivered to the <br />City and the Agency.:- == <br />viii) Developer shall establish and implement a program to monitor the <br />quality of the construction:._and shall inspect the progress of the course of <br />construction of t ie== Public - Parking Facility, and verify that the construction is <br />being carried out substantially in accordance with the Construction Documents. <br />The purpose of ths�lprogram shall be to assist in guarding against defects and <br />deficiency in the_work of the Contractor. Developer is not authorized as a part of <br />this service to= change, revoke, alter, enlarge, relax or release any requirements <br />of the Contract Documents or to approve or accept any work not performed in <br />accordance with the Contract Documents. Communication between the <br />Developer and Contractor with regard to Quality Review shall not in any way be <br />construed as binding the City and Agency as releasing the Developer or <br />Contractor from the fulfillment of any of the terms of his Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.