My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U -3 <br />D. Completion of the Project. <br />i) Developer, in consultation with the City and Agency and design <br />Consultants, shall determine when the Public Parking Facility is substantially <br />complete and shall, prior to issuing a Certificate of Substantial Completion, <br />prepare a list of incomplete work which does not conform to the Contract <br />Documents. This list shall be attached to the Certificate of Substantial <br />Completion. '&� <br />ii) Developer, in consultation with the nd Agency and design <br />Consultants, shall determine when the Project a ntractor's work is finally <br />completed, shall issue a Certificate of Final C etio shall provide to the <br />City and Agency a written recommendatio arding a nce of the Public <br />Parking Facility. <br />iii) Developer shall, as m e rticularly vided in Se _ below, <br />file any notices of completion requ or ed to be fil upon the <br />completion of the Project and taking suc as may be required to obtain <br />any certificates of occupar equivale as <br />required to permit the <br />occupancy of any improveme f9EUeveloper s mish to the City and Agency <br />a duplicate copy of the Noticekf Ca}�gtion sh thereon the date of filing <br />with said County Recorder. — — <br />iv) Developoi!�§hall receive- from t ri Contractor operation and <br />maintenanc manuals, wauanties a6d guarantees for materials and equipment <br />installed in::76 Public PiiNing Faciff -, bind such documents in an organized <br />manner and _deliver tti_materials tithe City and Agency promptly upon <br />completion of the Public arks g �cijj#y - <br />v) _ Davelopeeshall coordinate and expedite submittals of information <br />from the Contractors foeEcord drawings and specification preparation and shall <br />coordinate and e?pedite =i&R transmittal of record documents to the City and <br />Agency. The re documents shall include a complete, accurate set of <br />drawings for the 1` Parking Facility, the relocated utilities, and any other <br />portions =of the Pyiiiect for which City and Agency may have maintenance or <br />operations = responsibility showing the actual location of all facilities and <br />i m provements:asinstalled. <br />vi) Developer shall obtain an Occupancy Permit for the Public Parking <br />Facility and perform the following Services in connection with issuance of that <br />permit: accompany governmental officials during inspections of the Project, <br />prepare and submit documentation to governmental agencies, coordinate final <br />testing and other activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.