My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alternatives. <br />Not accept the project and defer acceptance until any known deficiency is corrected by <br />the Contractor. <br />Fiscal Impacts <br />This project is being funded by a federal RTSOP grant for $292,000 (88.5 %). RTSOP <br />grants require local matching funds for the remaining 11.5 %, and the City secured a <br />state TSM grant in the amount of $26,559 for this matching fund. The two grants total <br />$318,559. <br />The total project cost (design, administration, and construction) is $320,507, which <br />exceeds the combined two grants by $1,948. Funds in the amount of $43,309 are <br />available in the 2002 -2003 Capital Improvement Program budget under the Gas Tax <br />Construction Fund to cover the overage of $1,948. <br />er VYametsaJ Aruceedstrand Ed Everett <br />Senior Civil Engineer Community Development Services Director City Manager <br />SPV:ss <br />s/bbrarynepotts/peterlAwept_RTSOP 2 <br />ACCEPT _RTSOP 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.