My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2003-09-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2003
>
AgdaPkt 2003-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 2:16:15 PM
Creation date
9/18/2003 3:06:22 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 ID -I <br />REPOR T <br />To the Flonor4 ble Mayor and City Council <br />From the City Manager <br />September 22, 2003 <br />Subject <br />Final Acceptance — 2002 -2003 Sewer Main Replacement Project <br />Engineering File No. 806 -08 <br />Recommendation <br />Accept the 2002 -2003 Sewer Main Replacement Project, and authorize the release of <br />bonds and retention. <br />Background <br />Every year the City undertakes a sewer replacement program funded by the Capital <br />Improvement Program Sewer Fund. This program is designed for systematically <br />replacing sewer collection system main lines, which have a history of service <br />disruptions due to age, excessive maintenance requirements, and /or capacity <br />limitations. A priority list is reviewed and updated annually by the Community <br />Development Services Department - Engineering & Construction, to determine the <br />priority areas to be included in the program each year. This year's program includes <br />the relining of 6,300 linear feet of sewermain, and the rehabilitation of 32 manholes in <br />the following areas: <br />1. Harrison Street (6" sewermain from 7. <br />Clinton Street to El Camino Real) — <br />Trenchless Technology <br />2. El Camino Real (6" sewermain from 8. <br />Sequoia Station to Jefferson, and <br />from Diller Street to Madison Ave.) - <br />Trenchless Technology <br />3. Adams Street (8" sewermain from 9. <br />Harrison Street to Jefferson Street) - <br />Open trench replacement/upgrade <br />4. Chesterton Easement (6" sewermain <br />near Edith Avenue) — Trenchless <br />Technology <br />5. Altamont Way Easement (6" <br />sewermain near Highland Avenue) — <br />Trenchless Technology <br />6. Lonesome Pine Easement (6" <br />sewermain near Twin Oak Court) — <br />Trenchless Technology <br />10. <br />Madison Avenue (6" sewermain <br />from Adams Street to El Camino <br />Real) — Trenchless Technology <br />Lincoln Avenue (8" sewermain from <br />Adams Street to El Camino Real) <br />— Trenchless Technology <br />Woodsworth Easement (6" <br />sewermain from Whipple Avenue <br />to Edgewood Road) — Trenchless <br />Technology <br />Oakwood Drive (8" sewermain from <br />Oakwood Blvd. East to El Camino <br />Reap — Trenchless Technology <br />11. Hampton Avenue Easement (8" <br />sewermain from Sierra Street to <br />Kentfield Avenue) — Trenchless <br />Technology <br />
The URL can be used to link to this page
Your browser does not support the video tag.