My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt03 Beals Sport
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2003
>
Agmt03 Beals Sport
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:56:46 PM
Creation date
9/22/2003 11:15:03 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Beals Sport
PROJECT NAME
Fair Oaks School sports field
RMP File Number
304
Date
9/15/2003
MO Ref
03-187
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2) One final walk through and review punch list corrective work. <br /> 3) Warranty evaluation and M&O documentation. <br /> 4) Review as-built document~ as prepared by contractor. <br /> 5) Close project and organize electronic files, plans and construction <br /> binder. <br /> k) Project Administration. <br /> <br /> PRODUCTS <br /> The following products will be provided to the City by phase: <br /> <br />A. Project Start-up and Pre-planning - No products will be provided. <br /> <br /> B. Analysis & Design 1. Conceptual Design Plans (five sets of bond plans) <br /> 2. Digital Color Rendering (one mounted 30" x 42" plan) <br /> 3. Meeting Reports <br /> <br />C. Construction Documents <br /> 1. 65% Submittal Package - Five Sets of bond plans and project manuals <br /> 2. 95% Submittal Package - Five Sets of blue lines and project manuals <br /> 3. Bid Submittal Package - One Set of mylar drawings and electronic copy of project manual <br /> 4. Meeting Reports <br /> <br />D. Construction Services <br /> 1. Bidding Phase <br /> a) Addenda if required. <br /> 2. Construction Phase <br /> a) Weekly construction meeting agendas end reports. <br /> b) Observation reports. <br /> c) Submittal responses, including shop drawings. <br /> d) RFI responses. <br /> e) Punch List(s). <br /> <br /> PROJECT TILEMINE <br /> Refer to Exhibit A, Project Timeline, for the anticipated project schedule. <br /> <br /> SPECIAL PROVISIONS <br /> <br /> A. Without attempting to be all-inclusive and for purposes of clarity, the following items are specifically <br /> no.__~t included in the Scope of Services: <br /> 1. Meetings other than those listed. <br /> 2. Engineering (Electrical, Structural, Mechanical, Geotechnical) <br /> 3. Presentations to Public Bodies <br /> <br /> B. On January of each calendar year (beginning in 2005), the unbilled portion of this agreement will be <br /> subject to an approved increase to cover annual wage adjustments for office personnel. <br /> <br /> C. Services will be diligently pursued and every reasonable effort will be made to meet the mutually <br /> agreed upon schedule. If the completion of the services is delayed at any time in the progress of <br /> the work undertaken in this Agreement by conditions beyond the control of the Consultant; <br /> including but not limited to: strikes, lockouts, labor disputes, or the inability of Client, his <br /> consultants, utility companies, or jurisdictional agencies to provide required information, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.