My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 DES Architects
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 DES Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:56:52 PM
Creation date
9/29/2003 9:08:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
DES Architects
PROJECT NAME
fire station and maintenance facility
RMP File Number
304
Date
2/19/1997
Reso Ref
12986
MO Ref
01-169 02-50 02-80
Task Order
Yes
Amendment
Yes
Box
5802
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H. DES will conduct a day long design workshop with key DES design team <br /> members and sub consultants to develop schematic concepts sufficient for <br /> developing a schematic cost opinion. This workshop is open to participation by <br /> key City staff'as requested. <br /> 1. Working with the Structural Engineer, we will develop a preliminary <br /> flaming/foundation concept of the proposed structures. <br /> 2. Working with the Electrical Engineer, we will develop a preliminary <br /> electrical concept of the proposed structures and site. <br /> 3. Working with the Mechanical Engineer, we will develop a preliminary <br /> HVAC and plumbing concept of the proposed structures. <br /> 4. Working with the Fuel Engineer, we will develop a preliminary concept of <br /> the proposed structure. <br /> 5. Working with the civil engineer, we will develop a preliminary grading <br /> concept of the project site. <br /> 6. Working with the landscape architect, we will develop a preliminary <br /> landscape concept of the project site. <br /> <br /> I. Prepare as a supplement to documents defined under Phase II, Section D the <br /> following additional material: <br /> 1. Schematic Foundation/Framing Plans at ~inimttm 1:8 scale. <br /> 2. Schematic Mechanical Plans at minimum 1:8 scale. <br /> 3. Schematic Electrical Plans at ~inimum 1:8 scale. <br /> 4. Schematic Fuel System Plans at minimum 1:8 scale. <br /> <br /> J. The Architect will provide City staff with a detailed staffIhour allocation <br /> summary at the start of the project phase based upon fee referenced in agreement. <br /> <br />Phase III Construction Manager/General Contractor Selection <br /> <br /> A. Concurrent with the Schematic Phase of this project and working with the <br /> Redwood City Project Team, we will qualify and select a Construction <br /> Manager/General Contractor for this project. This work will occur in two phases. <br /> <br /> B. Phase I - Prequalification of Construction Manager/General Con, actor (CMIC,-C) 1. Debrief all participants in the Redwood City Hall CM/CJC process for <br /> constructive improvements to the process. <br /> 2. Prepare Request for Qualification (RFQ). <br /> 3. Prepare list of organizations to send RFQ to - General Contractors, Plan <br /> Rooms, etc. <br /> 4. Prepare advertisement/solicitations for RFQ. <br /> 5. Issue RFQ with review and approval of Redwood City Staff. <br /> 6. Prepare evaluation process and forms for RFQ responses. <br /> 7. Receive and sort responses to RFQ. <br /> <br /> Pag~ 6 of 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.