My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 DES Architects
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 DES Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:56:52 PM
Creation date
9/29/2003 9:08:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
DES Architects
PROJECT NAME
fire station and maintenance facility
RMP File Number
304
Date
2/19/1997
Reso Ref
12986
MO Ref
01-169 02-50 02-80
Task Order
Yes
Amendment
Yes
Box
5802
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8. Conduct evaluation of RFQ responses and ranking to lead to short list (3 <br /> to 5) of CM/C-C candidates. <br /> 9. Work with Redwood City Staff and City Attorney to prepare CM/GC <br /> contract and General Conditions of CM/GC contract. <br /> 10. Notify short listed CM/GC fn'm. <br /> <br /> C. Phase II - Selection of Consumction Manager/General Contractor (CM/GC) 1. Prepare Request for Proposal (RFP). <br /> 2. Issue RFP with specific instructions to short listed CM/GC's from Phase I <br /> (including process for contract contingencies). <br /> 3. Prepare evaluation process and forms for RFP responses including jury <br /> selection. <br /> 4. Facilitate interview process for all CM/GC candidates. <br /> 5. Facilitate a meeting of the selection jury to rank CM/GC candidates. <br /> 6. Work with Redwood City Public Works and City Attorney to prepare <br /> CMIGC contract and General Conditions of CM/GC contract. <br /> <br /> D. Our target will be to have selected the Construction Manager/General Contractor <br /> at the end of the schematic phase of the project, approximately mid October, <br /> 1996. <br /> <br /> E. The Architect will provide City staff with a detailed staff/hour allocation <br /> summary at the start of the project phase based upon fee referenced in agreement. <br /> <br />Phase IV Design Development <br /> <br /> A. Meet and work with the CM/GC team to value engineer the project and develop <br /> alternate design solutions to the budgetary limits identified with the proposed fee <br /> schedule. Building system value engineering will be performed on an hourly <br /> basis only as needed, we will establish hourly budgets to charge time against. <br /> <br /> B. ARer an acceptable direction is determined we will prepare documents that fix <br /> and describe the character of the project as to architectural, structural, mechanical, <br /> electrical system, materials and such other elements as may be appropriate <br /> including an outline specification and product (manufacturer) "cut sheets" of all <br /> major systems or components. <br /> <br /> C. Meet with the Redwood City Project Team on a bi-weekly basis throughout this <br /> phase of the project for a total of three times, commencing October 17, 1996 and <br /> concluding November 14, 1996. <br /> <br /> Page 7 of 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.