My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
MO 1978 1-150
RedwoodCity
>
City Clerk
>
Minute Orders
>
1970-1979 (Partial)
>
1978
>
MO 1978 1-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2011 4:26:24 PM
Creation date
8/1/2011 4:26:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minute Order
Meeting Type
Regular
Agency Type
City Council
Date
1/10/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> ♦ �� <br /> a. <br /> �" ��� � <br /> GENERAL IMPROVEMENT DISTRICT 1-64 <br /> CAPITAL IMPROVCMENT FUNDS <br /> GID L'UNDS <br /> 1 Potable �aater Supply 2,606,000 <br /> This pro�ect would be for the extens.ton of the Red- <br /> wood City water System from xetch Hetchy to Redwood <br /> Shores Approximately 31,000 lineal feet of 24", <br /> 20", and 18" line would be required This pro�ect <br /> is necessitated by the fact that the temporary <br /> supply agreement with Belmont County Water District <br /> will expire in 1980. The new supply will provide <br /> Redwood Shores with a permanent and reliable con- <br /> nection to the rest of xedwood City's water distrib- <br /> ution system <br /> 2 Flolly Street-Redwood Shores Parkway Interchange <br /> Participation 103,000 <br /> This is a 7oint pro7ect for the upgrading of the <br /> interchange It calls for the realignment to meet <br /> the needs of GID 1-64 Redwood Shores Parkway exten- <br /> sion and to provide safer access to the airport and <br /> GID 1-64 The pro7ect is also �oint-funded by FAU, <br /> County, San Carlos and GID 1-64 monies The GID <br /> 1-64 share is equal to approximately 6 4� of the <br /> total pro7ect <br /> 3 Area "A" Storm Water Retention System 1,748,000 <br /> Construction of a storm water retention basin capable <br /> of storing 100-year storm runoff from the drainage <br /> systems connecting through the U S. Highway 101/H011y <br /> Street interchange system and surrounding ad�acent <br /> properties, together with an inlet channel from the <br /> interchange to the retention basin and a Bay water <br /> inlet structure for water quality control to facili- <br /> + tate the environmental purposes within the channel and <br /> � basin areas includ.tng the creation of a wetland island <br /> within the basin and a pumping station and discharge <br /> conduit to control water elevations within the basin <br /> to provide far adequate s�torm water storage. <br /> 4 Exterior (Steinberger) Levee 321,000 <br /> Improvement of 2400 linear feet of the exterior levee <br /> along Steinberger Slough between Marlin No. 2 Subdivi- <br /> sion and the County F.irport at San Carlos, protecting <br /> the proposed commercial development in Pro�ect Area "A" <br /> by improvement of the existing levee to the standards <br /> set forth by the Corps of Engineers and the Department <br /> of [iousing and Urban Development toyether with the seismic <br /> criteria developed by the Corps, HUD and the Redwood City <br /> Seismic Review Board. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.