My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Edcco Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Edcco Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2011 1:41:06 PM
Creation date
8/2/2011 1:41:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Edcco Group, Inc.
PROJECT NAME
Glenwood Pump Station Engineering and controls for Rehabilitation Project, Q1110628001
RMP File Number
304.5
Date
7/29/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Glenwood Pump Station Re-build 2011 � <br /> Assist with contractor document rewew <br /> Temporary Pumping <br /> Furnish and Install new PLC/SCADA panel <br /> Modify existing SCADA system <br /> Ass�st with start-up <br /> Labor Temporary Pumpmg $4,035 00 <br /> Materials TemporaryPumping $35000 (taxable) <br /> Materials NewSCADAPanel $8,33415 (taxable) <br /> Labor NewPumpStation $9,93000 <br /> PROJECT TOTAL $22,64915 <br />
The URL can be used to link to this page
Your browser does not support the video tag.