Laserfiche WebLink
Glenwood Pump Station Re-build 2011 � <br /> Assist with contractor document rewew <br /> Temporary Pumping <br /> Furnish and Install new PLC/SCADA panel <br /> Modify existing SCADA system <br /> Ass�st with start-up <br /> Labor Temporary Pumpmg $4,035 00 <br /> Materials TemporaryPumping $35000 (taxable) <br /> Materials NewSCADAPanel $8,33415 (taxable) <br /> Labor NewPumpStation $9,93000 <br /> PROJECT TOTAL $22,64915 <br />