My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Edcco Group, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 Edcco Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2011 1:41:06 PM
Creation date
8/2/2011 1:41:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Edcco Group, Inc.
PROJECT NAME
Glenwood Pump Station Engineering and controls for Rehabilitation Project, Q1110628001
RMP File Number
304.5
Date
7/29/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Glenwood Pump Station Re-build 2011 <br /> TemporaryPUmpmgTasks Quantity Rate Total <br /> Labor ReviewContractdocuments 4 $15000 $60000 <br /> Labor Temporary Controls Drawings 3 $105 00 $315 06 <br /> La6or Meetings 2 $15000 $30000 <br /> Labor DisconnectSCADAPanel 3 $31000 $33000 <br /> Connect SCADA panel to power, phone <br /> Labor (ines, trensducers, and control valve 6 $110 00 $660 00 <br /> Labor Connect SCADA panel to engine pump 2 $110 00 $220 00 <br /> Labor Troubleshoot and reprogram engine pump 2 $130 00 $260 00 <br /> Labor ReprogramPLC 4 $15000 $60000 <br /> Labor MainSCADAModifications 1 $15000 515000 <br /> Test/Start-up SCADA Panel and pump <br /> (multiple trips due to pump and phone line <br /> Labor issues 4 $150 00 $600 00 <br /> LABOR TOTAL $4,035 00 <br /> MATERIALS 1 $35000 $35000 <br /> GRAND TOTAL 54,385 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.