My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 Lone Star Landscape Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt11 Lone Star Landscape Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2011 8:11:11 AM
Creation date
8/8/2011 8:11:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Lone Star Landscape Inc.
PROJECT NAME
Broadway Sidewalk Extension (2644 Broadway to 2636 Broadway)
Date
6/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Damage to existing structures, facilities, utilities, trees, pavements, or other <br /> property caused by the Contractor shall be restored to original condition at the <br /> Contractor's expense, prior to final inspection and acceptance. <br /> VII. GENERAL TRAFFIC CONTROL, SAFETY, & ACCESS <br /> A. The contractor shall keep the sidewalk open at all times. if a sidewalk closure is <br /> necessary, contractor shall first obtain permission from the City Engineer and <br /> then shall make provisions for an alternate pedestrian access. <br /> B. At no time shall pedestrians be diverted onto a portion of the street used for <br /> vehicular traffic. At locations where safe alternate passageways cannot be <br /> provided, appropriate signs and barricades shall be installed at the limit of <br /> construction and in advance of the limits of construction at the nearest crosswalk <br /> or intersection to detour pedestrians. <br /> C. The contractor agrees to assume sole and complete responsibility for job site <br /> conditions during the course of construction of this project, including safety of all <br /> persons and property. <br /> D. Access to businesses shall be provided at all times. <br /> VIII. DAMAGES FOR DELAYS <br /> A. Liquidated damages, for the period of time that any portion of the work remains <br /> unfinished after the time fixed for completion in the Contract Documents, as <br /> modified by extensions of time granted by the Owner, it is understood as agreed <br /> by the Contractor and the Owner that the contractor shall pay the Owner Five <br /> Hundred and No/100 Dollars ($500.00) per day liquidated damages. <br /> IX. WORK COVERED UNDER THIS CONTRACT <br /> A. Notification of area businesses 14 days prior to construction <br /> B. Traffic control <br /> C. Removal of wheel stops, concrete vertical curb, signs, and grinding of existing <br /> pavement markings <br /> D. Removal of the parking payment machine. This item shall be returned to the <br /> Public Works Services Department, located at 1400 Broadway. <br /> E. Installation of concrete pavers (sidewalk), concrete vertical curb, and trench drain <br /> to match existing <br /> F. Installation of new brick planters, concrete footing, and fencing to match existing <br /> G. Installation of tree wells, street trees, and bike rack <br /> H. Installation of new pavement markings <br />
The URL can be used to link to this page
Your browser does not support the video tag.