|
460 . �
<br /> Trade�or Occupation Per Diem Hourly ��a�e •
<br /> ENGINEERS (Con't) • �>
<br /> "�
<br /> Power brader, po�rer planer, motor patrol �
<br /> or any tyne nower ;;lade � 14.80 � 1,85 �+
<br /> Power shovels and/or other eo,uipn�ent with "�
<br /> shovel type controls-up to 1 yard 16.00 2.00
<br /> Power sho�%els �nd/or other equipment with
<br /> sliovel t;� control�-over T yard 18.00 2.25 '
<br /> � Pugrnills - ',Noodmixed type 14.00 �1.75
<br /> LeTourneau pulls, jeeps a,nd similar types
<br /> ` of equipment 14.00 1.75
<br /> Pumps 11.'60 1. 45
<br /> Rollers 13.20 1.65
<br /> Self-propelled eleva.ting grades plane , 14.00 1.75
<br /> Screed man 10,80 1.35 .
<br /> Spreader machines (Barber, Green, Jeager, ,
<br /> etc.)(Engineer & Screed man reQUired in '
<br /> operation) 14.00 1.75
<br /> Surface hea.ters 13.60 1.70
<br /> Tractors 13.60 1.70
<br /> Tractors (ta.nden) 10.00 2.00 '
<br /> Tractors (�^rith boom) 10.00 2.00
<br /> Tra.ctor type shovel loader 16.00 2.00
<br /> Apprentices (Oilers, Firemen, t'd'atchmen) 11.20 1,40
<br /> Trencfiing m�.chine 14.80 1.85
<br /> Truck cr�,nes 14.80 1.85
<br /> Oilers on truck cranes 11.20 1.40
<br /> HODCARRIERS �
<br /> Brick or stone - 6 hours 1z,00 1.57z
<br /> Plaster 14.00 1.75
<br /> IRON'.VO�"�CER$
<br /> Structural, Bridge a,nd all Riggers 16.00 2.00
<br /> . ',Velders 16.00 2.00
<br /> Ornamenta.l Iron 4':orkers 12.80 1.60
<br /> Reinforcing Iron o,rorker, Houseman, Rodman,
<br /> Concrete ivork 14.00 1.75
<br /> LABOrZF.IRS
<br /> Group 1. '
<br /> Header Board Cribbers, La,ggers, Blasters, Pow-
<br /> dermen, Drillers, High scaler (form raisers),
<br /> �Sand Blasters, 'u,�agon Drill, Cornbination
<br /> Jackharnmer & Powderma�n � 12.00 1.50
<br /> Group 2, -
<br /> Concrete Plixer (under one-half yard), kspha.lt
<br /> Ironers & Ra.kers, Concrete Pan 7dork, Mag-
<br /> nesite & W.astic 1',orkers (wet or dry), Sloper
<br /> Nucker underground, Pavement Breakers, Jack-
<br /> hammer Vibra,tors & all air, gas & electric
<br /> tools, loading or unloading, ca.rrying & ;
<br /> ha.ndlino all rods & materials for use in
<br /> reinforcing concrete construction 11.00 1.37z
<br /> Groun 3. �
<br /> General Labor, Gardeners and Landscape Laborers,
<br /> Brid e I,a.borers, Construction Laborers, Track-
<br /> men �construction, rnaintenance & repair),
<br /> all cleanup work of debris,-Grounds & Sldgs.,
<br /> Pratchmen, flagmen & guards, concrete laborers
<br /> (vret or dry), and asphalt shovelers 10.00 , 1.25
<br /> PL iJfli BE RS
<br /> Pl�nbers, Steamfitters, ,�elders, Caulkers, '
<br /> Pinefitters 15.00 1.872
<br /> TEAMSTERS
<br /> �rds, or less 9;20
<br /> 3 yards 9.20
<br /> 4 yards 10.12
<br /> 5 yarde 10.12
<br /> 6 yards�' 11.00.
<br /> 7 yards 11, 00 '
<br /> 8 yarc7s 13.80
<br /> 9 yards 13.80
<br /> TRANSIT aSIX '
<br /> 2 yards or less 9,28
<br /> 3 yards 9.89
<br /> 4 yards 13.00
<br /> 5 yards 13.00
<br /> 5 yards 13.00
<br /> �
<br /> �
<br />
|