Laserfiche WebLink
460 . � <br /> Trade�or Occupation Per Diem Hourly ��a�e • <br /> ENGINEERS (Con't) • �> <br /> "� <br /> Power brader, po�rer planer, motor patrol � <br /> or any tyne nower ;;lade � 14.80 � 1,85 �+ <br /> Power shovels and/or other eo,uipn�ent with "� <br /> shovel type controls-up to 1 yard 16.00 2.00 <br /> Power sho�%els �nd/or other equipment with <br /> sliovel t;� control�-over T yard 18.00 2.25 ' <br /> � Pugrnills - ',Noodmixed type 14.00 �1.75 <br /> LeTourneau pulls, jeeps a,nd similar types <br /> ` of equipment 14.00 1.75 <br /> Pumps 11.'60 1. 45 <br /> Rollers 13.20 1.65 <br /> Self-propelled eleva.ting grades plane , 14.00 1.75 <br /> Screed man 10,80 1.35 . <br /> Spreader machines (Barber, Green, Jeager, , <br /> etc.)(Engineer & Screed man reQUired in ' <br /> operation) 14.00 1.75 <br /> Surface hea.ters 13.60 1.70 <br /> Tractors 13.60 1.70 <br /> Tractors (ta.nden) 10.00 2.00 ' <br /> Tractors (�^rith boom) 10.00 2.00 <br /> Tra.ctor type shovel loader 16.00 2.00 <br /> Apprentices (Oilers, Firemen, t'd'atchmen) 11.20 1,40 <br /> Trencfiing m�.chine 14.80 1.85 <br /> Truck cr�,nes 14.80 1.85 <br /> Oilers on truck cranes 11.20 1.40 <br /> HODCARRIERS � <br /> Brick or stone - 6 hours 1z,00 1.57z <br /> Plaster 14.00 1.75 <br /> IRON'.VO�"�CER$ <br /> Structural, Bridge a,nd all Riggers 16.00 2.00 <br /> . ',Velders 16.00 2.00 <br /> Ornamenta.l Iron 4':orkers 12.80 1.60 <br /> Reinforcing Iron o,rorker, Houseman, Rodman, <br /> Concrete ivork 14.00 1.75 <br /> LABOrZF.IRS <br /> Group 1. ' <br /> Header Board Cribbers, La,ggers, Blasters, Pow- <br /> dermen, Drillers, High scaler (form raisers), <br /> �Sand Blasters, 'u,�agon Drill, Cornbination <br /> Jackharnmer & Powderma�n � 12.00 1.50 <br /> Group 2, - <br /> Concrete Plixer (under one-half yard), kspha.lt <br /> Ironers & Ra.kers, Concrete Pan 7dork, Mag- <br /> nesite & W.astic 1',orkers (wet or dry), Sloper <br /> Nucker underground, Pavement Breakers, Jack- <br /> hammer Vibra,tors & all air, gas & electric <br /> tools, loading or unloading, ca.rrying & ; <br /> ha.ndlino all rods & materials for use in <br /> reinforcing concrete construction 11.00 1.37z <br /> Groun 3. � <br /> General Labor, Gardeners and Landscape Laborers, <br /> Brid e I,a.borers, Construction Laborers, Track- <br /> men �construction, rnaintenance & repair), <br /> all cleanup work of debris,-Grounds & Sldgs., <br /> Pratchmen, flagmen & guards, concrete laborers <br /> (vret or dry), and asphalt shovelers 10.00 , 1.25 <br /> PL iJfli BE RS <br /> Pl�nbers, Steamfitters, ,�elders, Caulkers, ' <br /> Pinefitters 15.00 1.872 <br /> TEAMSTERS <br /> �rds, or less 9;20 <br /> 3 yards 9.20 <br /> 4 yards 10.12 <br /> 5 yarde 10.12 <br /> 6 yards�' 11.00. <br /> 7 yards 11, 00 ' <br /> 8 yarc7s 13.80 <br /> 9 yards 13.80 <br /> TRANSIT aSIX ' <br /> 2 yards or less 9,28 <br /> 3 yards 9.89 <br /> 4 yards 13.00 <br /> 5 yards 13.00 <br /> 5 yards 13.00 <br /> � <br /> � <br />