My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Minutes 1946
RedwoodCity
>
City Clerk
>
Minutes
>
1946 (partial)
>
Minutes 1946
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 4:43:02 PM
Creation date
8/10/2011 4:42:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Meeting Type
Regular
Agency Type
City Council
Date
1/7/1946
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, 477-. <br /> up.Arlington to Blandford plus either,a 6° or 8" connection from.Alameda de <br /> • las Pulgas to Woodsworth, A new 6 line on Oakdale from VPhipple Avenue to <br /> Edgewood Road, 10" line to.00nnect with the present 12° line at Broadway and <br /> E1 Caraino Real, up Broadway to Arch, up Arch to_Whipple. New linee in the <br /> diatrict in which the etreet work contract hae �ust been awarded, 6° line <br /> ' on Hudson Street, 6" line on Poplar and on Ebner. Aew linee in Redwood Yilla <br /> Park. New line on Broadway from Mai�n Street to Maple 8treet including 8" <br /> . line on 9treet and Maple 3treat in the Broadway No. 3 development. <br /> 12" line for new oonnection to be made at about 12th Avenue Yrom the Hetoh <br /> Hetchy to get acrose the railroad track to eupply Redwood Manor Tract, <br /> ,' and a new line back toward the city to boleter up the pressure in the down- <br /> torm area. Pipe.for the first portion of the firet development of Redwood <br /> Terrace, .Thoae were the ma�or pro�ects in the order of pipe. At the time <br /> we received bids from the pipe manufacturera, they agreed to deliver in July <br /> or August some of the 4" and 6" pipe. When the Redwood Terrace project <br /> • developed rather�rapidly, a specia.l request was made that they eupply ue with <br /> i <br /> 8" pipe to take care of the exteneion on Woodeide Road. We.were able to get <br /> 3600 feet of S" pipe because oY tnis epecial request delivered for this ' <br /> epecific project earlier ttian it would have been delivered under the origi- <br /> nal contract, iYe have receined recently 12" pipe and all oP the 4" pipe <br /> and tnere ie on hand some 6" pipe. It wae Mr, Blom�s opinion that there ie <br /> �uet about eufficient pipe to do the VPoodeide �ob and perhape enough to do <br /> ' . the extenaion on Oakdale from Y7hipple to Edgewood Road, The balance oY the <br /> 8" pipe ie scheduled for delivery in October and Nonember and it was be- <br /> lieved it would be delivered on eohedule. There is sufficient pipe on <br /> order to do all the �obe mentioned, Mayor Hilton asked if the water situa- <br /> tion was worse in Edgewood Park area that in other parts of the city. Qity <br /> Manager Hlom advised that other sections of tovm are just ae bad and that <br /> complaints had been received from the Eagle Hill District. In anewer to <br /> . Mayor Hilton�s question, City Manager Hlom advised that there wovld be a <br /> � saving of between 30 and 60 days in the completion of the Edgewood Road job <br /> if the pipe allocated to.Redwood Terrace were used. • <br /> Mr. Ticer atated that the plan ae submitted to the Board of Underwxiters <br /> called for 8" pipe and no IlO°. City Manager Blom stated that inetead of in- <br /> creaeing tne size of the main in E1 Camino Real, it is being moved to Arch � <br /> , Street and a 10" line used inetead of an 8". He believed it �uould aYford <br /> Detter protection to buildinga fronting on E1 Camino Real and to the <br /> apartmerit houae area. <br /> Councilman Armstrong was of the opinion that, due to the fact that the sub- <br /> ' division wae not qet developed, the pipe should be used in the developed <br /> area. He stated he was aware of the fact that by diverting the pipe there <br /> would be additional cost of tearing up panement in the Redwood Terrace sub- <br /> division at a later date, but he beliened_the primary purpose wa.s to eerve <br /> Lne populated area first, . - • <br /> Councilman McNulty asked if there was any priority for the pipe. City <br /> • Mana.ger Blom replied that there was not. The 8" pipe now on hand, however, <br /> � �. <br />
The URL can be used to link to this page
Your browser does not support the video tag.