My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res99 RD-99-30
RedwoodCity
>
City Clerk
>
Resolutions
>
Redevelopment
>
1990-1999
>
1999
>
Res99 RD-99-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2012 4:12:39 PM
Creation date
10/9/2003 2:23:13 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
Redevelopment
Date
8/9/1999
Supplemental fields
Box
6150
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. � ATTACHMENT 6(a) <br /> Brian Kangas Foulk <br /> Engineers . Surveyors . Planners . � <br /> Description of Shared Infrastructure <br /> /rvine�nrmren[ Comma�ni/res nnd Sheo Homes — Al! Phares /nt bt�ildout) <br /> L Maple Street <br /> •'Reconstruct Maple Street behveen EI Camino Real and the Joint Powers Board's <br /> CalTrain right-of-way. <br /> • Realign Maple Street at its intersection with EI Camino Real. <br /> • Close and barricade Lathrop Street at the intersection with Maple Street. <br /> • Provide a dedicated right and left turn lane on Maple Street at die �I Camino intersection <br /> and provide a dedicated left turn lane from Maple Street onro Pranklin Street. <br /> II. Franklin Street . <br /> • Relocate Franklin Street between Maple Street and Monroe Street. <br /> • Replace and narrow Franl:lin Street between Monroe Street and Jefferson Street. <br /> • Modify the pedestrian crossing at the intersection of Frankfin Street and Jefferson Street. <br /> III. El Camino Rea( <br /> • AQodify the traffic signal medians and signing and striping at the intersection of EI <br /> Camino and the realigned Maple Street. <br /> • Install frontage impro��ements on EI Camino behveen Maple Street and Jefferson Street. <br /> • Construct new curb cuts at the pri��ate street connecting to the Bekins building and <br /> Building I A parking garage. <br /> • Construct new curb cut at the new private streets (Madison and Jackson). Provide <br /> medians to aflow riglit turn in and out of Madison, while continuing to allow and <br /> accommodate lefr turns from El Camino onto the south feg of Madison Street and from <br /> soutl� Madison Street onto EI Camino. <br /> IV. Public Undereround Utilities <br /> A. Storm Drainage. <br /> • Install trunk line from the Redwood Creek outfall near Maple Street to the relocated <br /> Frankfin Street. <br /> • Continue the trunk line in P'ranklin Strcet, Madison Street and Jackson Street. <br /> Accommodate and connect off-site piping at Madison Street. <br /> 540 Price Avenue • Redwood Ciry, CA 94063 • �6 501 482-6300 • FAX 16501482-6399 <br /> One nf Fnur <br />
The URL can be used to link to this page
Your browser does not support the video tag.