Laserfiche WebLink
Brian Kangas foulk <br /> Engineers . Surveyors . Planners � <br /> • Construct a second trunk line in Franklin Street and Wilson Street to discharge into <br /> [he existing box cufvert at CalTrain right-of-��-ay. Accommodate and connect off-site <br /> piping at Jefferson Street � <br /> B. Water Line. <br /> • Install a new 12" water line in Franl:lin Street between Jefferson Street and Maple <br /> Street. Connect the water line to die e�isting 8" water line in Maple Street and the <br /> existing 8" water line in Jefferson Street. <br /> • Install a new 8" water line in the new private street between Bekins and Building lA <br /> and tie into the existing 12" water line on EI Camino. This new water line will <br /> provide fire protection. <br /> • Connect to the existing 12" water line on E! Camino at intersections with Madison <br /> and Jackson Street. <br /> C. Sanitary Sewer. <br /> • Install new sewer line from the north end of Monroe Street to Franklin Street. <br /> Connect sewer in Franklin Street to existing manliole at Wilson Street. Tlie existing <br /> Wilson Street sewer will remain. Abandon existing line in Monroe Street and along <br /> the Ca]Train right-of-way. <br /> • Connect existing sewer lines at EI Camino into ne�v se���er lines in Madison and <br /> Jackson Streets. <br /> I::IMAIN\ I997\97009i-20.IAClCortcspondcncc\ I999\OG0999Ada. in GaAac.doc <br /> 540 Price Avenue • Retlwood Ciry, CA 94063 • �6501482-6300 • FAX �650) 4ffi-6399 <br /> Twn nf Frnir <br />