My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-08-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2012 12:02:59 PM
Creation date
8/18/2011 4:39:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/22/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.1. - Page 2 <br /> West Valley Construction Company, Inc. — San Jose 891,935.00 <br /> Pacific Underground Construction, Inc. — San Jose 903,425.00 <br /> California Trenchless, Inc. — Hayward 904,705.00 <br /> RGW Construction, Inc. — Livermore 909,450.00 <br /> Platinum Pipeline, Inc. — Dublin 955,410.00 <br /> W.R. Forde Associates — Richmond 968,070.00 <br /> Lewis & Tibbitts, Inc. — San Jose 968,447.00 <br /> EPS, Inc. dba Express Plumbing — San Mateo 979,550.00 <br /> J.W. Ebert Corporation — San Jose 1,046,703.00 <br /> J& M, Inc. — Livermore 1,121,244.00 <br /> I <br /> Engineer's Estimate $1,000,000.00 <br /> Recommended Bidder: Shaw Pipeline, Inc. <br /> Substantiation: Shaw Pipeline, Inc. is the lowest responsive and responsible bidder. <br /> The low bid of $790,200.00 submitted by Shaw Pipeline's is 21 % lower than the <br /> engineer's estimate of $1,000,000.00. The initial apparent low bid of $789,500.00 by <br /> Bay Pacific Pipelines, Inc., was invalidated upon review due to their error when adding <br /> item costs. Bay Pacific Pipelines, Inc. acknowledged the error to city staff and restated <br /> their total bid price as $819,500.00. Shaw Pipeline, Inc. has successfully completed <br /> similar projects in the past and is a qualified contractor. Based on the bids received, <br /> staff believes that the low bid is reasonable and recommends awarding the contract to <br /> Shaw Pipeline, Inc. <br /> Construction is expected to begin at the end of August, 2011, and conclude within 120 <br /> calendar days. The city will give notice to all residents and businesses that might be <br /> affected by the construction. Additionally, the contractor is obligated to notice area <br /> residents and businesses two weeks prior to the start of work on each street and/or two <br /> days prior to any interruption of water service. Signage that contains project information <br /> will be posted at the construction sites and construction updates will be available on the <br /> city's website. <br /> ALTERNATIVES <br /> Council may choose not to award the contract and direct staff to redesign and/or rebid <br /> this project. Continued deterioration of the watermain in the project area will increase <br />
The URL can be used to link to this page
Your browser does not support the video tag.