Laserfiche WebLink
6.1. K. - Page 3 <br /> ENVIRONMENTAL REVIEW <br /> As the lead agency, City of Redwood City has determined that the Sanitary Sewer and <br /> Water Replacement Project (Redwood Avenue, Norman Court, and Ebener Street) <br /> meets the California Environmental Quality Act (CEQA) exemption criteria as set forth in <br /> Section 15301 (Existing Facilities) and Section 15302 (Replacement or Reconstruction) <br /> of the CEQA Regulations. Furthermore, this project has been designed compliant with <br /> the city's Engineering Standards and accepted practices. <br /> This project does not require a National Pollutant Discharge Elimination System <br /> (NPDES) General Permit for stormwater discharges associated with construction and <br /> land disturbance activities pursuant to Attachment A.2 of Order 2010-0014-DWQ which <br /> exempts projects to update existing lines and facilities. However, the proposed <br /> construction will employ stormwater pollution prevention best methods and practices. <br /> ���� l � <br /> S. PETER VORAMETSANTI, PE <br /> ACTING CDD MANAGER/CITY ENGINEER <br /> �'�t/�� <br /> BILL EKERN <br /> COMMUNITY DEVELOPMENT DIRECTOR <br /> � � ��� <br /> ROBERT B. BELL <br /> CITY MANAGER <br /> ATTACHMENT <br /> Project Location Map <br /> RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br /> 1. Contract Documents <br /> 2. Bid Documents <br />