Laserfiche WebLink
8.A. - Page 142 <br /> available until design-level engineering has been performed for Phase 1 and Phase 2, it is <br /> not clear how these assumptions can be made without this critical data. It seems like an <br /> accident waiting ta happen! ! ! <br /> As for the fufure, we are strongly opposed to granting a Planned Developrnent Permit for <br /> this project. This would be an open invitation ta irresponsible building practices, which <br /> are not consistent with the Redwood City General Policy. This property is designated <br /> low density under the General Plan (C4) and is RH zoned. It seems like the only way this <br /> project could go forward is if Laurel Way Joint Ventures is given approval for a PD <br /> permit. A PD permit would be environmentally unacceptable since it would increase <br /> height restrictions, would allow building on sIopes greater than 30 degrees, would <br /> decrease setbacks, would allow building on lots that are too srnall, and would allow the <br /> remova� of heritage trees. <br /> These investors bought these fots for a low price knowing what the zoning and building <br /> resirictions were on these properties. They made the informed decision to take a risk and <br /> invest in properties, which they new would be difficult to develop. They shau�d not be <br /> given special privileges to bnild and shou�d follow the same building codes and practices <br /> that the existing homeowners in the suz-rounding neighborhoods are required to abide by. <br /> Everyone has a legal right to build if they fol�aw the rules and regulations but not every <br /> piece of land can be built on successfully. Having these zoning codes and reg�lations is <br /> what keeps the characteristic appearance of surrounding neighborhoods. I hope that the <br /> both the Planning Cornmission and Council would consider what precedence this would <br /> set if they were ta grant the applicant a�lanned development permit in this area of <br /> Redwood City. <br /> As for the project altematives, I recornrnend that Planning Cornmission anc� Council <br /> consider adopting the No Project Alternative in the EIR as this alternative seems to be the <br /> only reasonable alternative which wouId resuIt in reduced environrnenfal impact across <br /> the board in all categories as stated in the Fina1 EIR and would require the project to <br /> follow current zoning reguiations. I do not agree with the statements in the final EIR <br /> suggesting that no development can result in a potential significant impact to the <br /> environment since this property has been basically like this �orever, and no problems <br /> have arisen in the past 20 or more years which is great evidence for support of this <br /> alternative. I also disagree with the comment in the Final EIR that states under this <br /> alternative, there is a possibi�ity for piecemeal construction if the individual property <br /> owners wEre to ap�ly individually for permits to buila. I do not see how this would be <br /> possible since these lots either exceed a 30 degree slope or are substandard atad do not fit <br /> current zoning regulations. <br /> For the record, I am opposed to alternative B as it does not fi� with current zoning and <br /> squeezing 18 hames onto this very steep terrain with basically little ta no backyaxds or <br /> front yards is in no way characteristic of the surro�.nding rural anc� low density styZe in <br /> our neighborhood. I am also opposed to alternative C. Building bigger houses on steep <br /> land is not a solution and creates more problems. This alternative does not make sense <br /> that if you combine 2-3 lots of slopes that are greater than 30% �hat then i� is okay to <br />