Laserfiche WebLink
6.1. D. - Page 9 <br /> e. Check all aligning re�isters. <br /> f. �ynarrric balance impell�r <br /> g. Replace bearin�� and �eals. <br /> 4. When r�quired, replac� the folle�vuing parts: <br /> a. a. 4i� ss ��n� <br /> b. 1 A�16 SS Gine Shaft <br /> c. 1 �16 SS He�d Shaft <br /> d. 1 Bronze Suctian ��wl ��arin� <br /> e. 1 �ronze Lower 6ovvl �e�ring <br /> f. 1 �ronze lJpper �owl Bearing <br /> g. 2 Oi) Tube Line Sf�aft �earin� <br /> h. 1 Top Oil Tube Tension Bearings <br /> i. 1 Shaft Lip Seal <br /> 5. All replacement parts must meet manufactures specifications. <br /> 6. Major parts such as bowis and impellers must be same as pump manufacturer. <br /> 7. All nuts and bolts to be 316 S5 (stainless steel) <br /> 8. The City retains the right to inspect pumps durin� disassemble ar�d inspection, and to inspect <br /> any and all repl�ced parts. <br /> �. FI�� G�te 1�raina � at�. Mafi�ri�ls. ��plac�m�nt. �� aer Ar�d Ir�stallati�n <br /> 1. Prapos�r is respansible for the inspection, removal, repair or replacement of flap gates at the <br /> identified pump station locatians. <br /> 2. Repairs, fteplacements, Installation and materials will be to Redwood City Standards. (Listed <br /> below} <br /> a. All gates will be cast iron. <br /> b. �II bushings and se�ts must be bronze. <br /> c. All assembly and all hardware will be 316 stainless steel, <br /> d. All nuts, b�fts a�d washers will be 316 stainless steel. <br /> e. All hin�e arms will be stainless steel. <br /> f. All g�tes and c�st iran parts vuill be fusian epoxy coated. <br /> v�r�sre�ra�ER maNn�E���vr seevi�es �iuisio� � <br /> RFP STORM lt7tLl"TY SY5TENI PUIV}P STAYIOnI — MAIMTE(VO.NCE A(U� EMERfiENCY SERVICES F�R pt11VIP$, (�OTC)RS, FCd1F' / DStAIN�GE �AeYES <br /> General Services Agreement between the City of Redwood City and Pump Repair Service Company 08/22/2011 <br /> Page 7 of 11 <br />