My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2011-08-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2011
>
AgdaPkt 2011-08-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2012 12:02:59 PM
Creation date
8/18/2011 4:39:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/22/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
456
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. D. - Page 10 <br /> 3. New instailatiorrs will include rerr�oving existing gate(s) and installing new �ate(s). Only <br /> stainless st�el w�d�e anchors will be used. Concrete nr �rout used will be approved by <br /> Redwood Ci�y. <br /> 4. Cnntractor will us� �/Vaterman (V{anufactured Products exclusively. There will b� no <br /> substitutes. <br /> 4. R�dvvoc�d City �nrill r�quire all r�p{��ed parts ta be �iven to R�dvd�ad City. <br /> 5o There will be no subs�itutions without the �bsolut� writt�n permissi�n from R�duvood City. <br /> 6. Contract�r is respansibl� far any and �II envirc�nmental approvals and or permits required <br /> from any and all re�ulatory a�encies and prepare appropriate applications and dc�currrerrts for <br /> Redwood Ci�y submittal. <br /> 7. Contractor will be responsible far all constructiar� related to wf�rk on �ates. <br /> 8. All replacerrient parts will be to Redwood City Standard (explained above) <br /> 9. Cantractor will provide Redwood City with an inspectian repart directly after gate removal. <br /> 10, R�dwoad City will inspect work throughout each project. <br /> F�� Sch�d <br /> Contract must provide a Corripany f�e schedule showing, the follow at a minimum, or compl�te the <br /> attached form: <br /> �. Staffing, <br /> b. Equipment, inc(uding rentals, if any, <br /> c. Incidental costs, i.e. travel (per mile), equipment, storage, administrative fees . Note: City <br /> accepts the IRS established mileage rate of 55.5 cents per mile. <br /> A�TA,CI��/IEt�T C <br /> WASTEWA7E� MAfVAGEMENT SERVICES �IVISIQfV 3 <br /> RFP STORRfl UTILITY SYSTEM PUMP STATI�IV — MAIRITENdBfVCE l�tNd En/IEft�EfV�Y SEftVICES F��2 PUMPS, MOT�RS, �Ll1P /�t2AINP�GE �,4TE$ <br /> General Services Agreement between the City of Redwood City and Pump Repair Service Company 08/22/2011 <br /> Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.