My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt11 BKF Engineers-Redwood Creek
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2011
>
Agmt 11 Under 60K
>
Agmt11 BKF Engineers-Redwood Creek
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2011 10:29:28 AM
Creation date
9/19/2011 10:29:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Redwood Creek 30 year design Creek peak flow rate
RMP File Number
304.5
Date
9/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� EXHIBITA-BKF 597806L <br /> V. Proposed Hours <br /> TOTAL <br /> TASK 1— Data Collection 24 hours <br /> TASK 2— Basis of Review 28 hours <br /> TASK 3. — Analyses 40 hours <br /> TASK 4: Existing Conditions Assessment 132 hours <br /> TASK 5: Conceptual Improvements 124 hours <br /> TASK 6: Draft and Final Report 80 hours <br /> TOTAT. 428 honrs <br /> BKF <br /> (Priroe Consultant) <br /> TASK 1— Data Collection 12 hours <br /> TASK 2— Basis of Review 12 hours <br /> TASK 3. — Analyses 40 hours <br /> TASK 4: Existing Conditions Assessment 60 hours <br /> TASK 5: Conceptual Improvements 60 hours , <br /> TASK 6: Draft and Final Report 20 hours <br /> TOTAL 204hours <br /> Optional Task 1 a <br /> 2 Person Field Crew 120 hours <br /> Office Time 40 hours <br /> Comerstone <br /> (Structarel failures, costa and constraints) <br /> TASK 1— Data Collection 4 hours <br /> TASK 2—Basis ofReview 8 hours <br /> TASK 3. — Analyses 0 hours <br /> TASK 4: Existing Conditions Assessment 40 hours <br /> TASK 5: Conceptual Improvements 40 hours <br /> TASK 6: Draft and Final Report 32 hours <br /> TOTAL 124 hoars <br /> BAGG <br /> (Geotechnical failures, costs aud constraints) <br /> TASK 1— Data Collection 4 hours <br /> TASK 2—Basis of Review 4 hours <br /> TASK 3. — Analyses 0 hours <br /> TASK 4: Existing Cor�ditions Assessment 16 hours <br /> TASK 5: Conceptual Improvements 20 hours <br /> TASK 6: Draft and Fina] Report 20 hours <br /> TOTAL 64 hours <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.