My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2011-115421
RedwoodCity
>
City Clerk
>
Recorded Docs 2010-2012
>
2011
>
RecDoc 2011-115421
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2011 4:05:34 PM
Creation date
10/3/2011 2:41:34 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measure Maintenance Agreement
Doc Num
2011-115421
Rec Date
10/3/2011
Address
One Marina, 630 Bair Island Road
Parties
RC Peninsula Park, LLC
MO Ref
11-151
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT l'" <br />, <br />PRECAST CONCRETE MODULAR STORM WATER DETENTION <br />2495 IV. BUNGA 10 IV RBA0 - NORRIS. it 60450 f I.81 -ST R14TRAP WIN. S TORAI IRA P. Of <br />Maintenance Procedures <br />The f llowing procedures are for th e main ton n f S t rm Trap as sugrgr st d by Storm Trap, LL C. <br />All regulations set by govemi ngR bodies retain precedence over the subsequent instructions. <br />Detention system <br />1. Do not enter the StormTrap system unless properly trained, equipped, and qualified to eater <br />confined space as identified by local occupational safety and health regulations. <br />2. StormTrap recommends an annual inspection. Frequency of cleaning will vary due to site conditions <br />and storage capacity. StormTrap recommends maintenance when the sediment occupies more than <br />ono -tenth of the system's volume. Also refer to local municipality regulations for their maintenance <br />requirements and schedules. Inspections should be a part of your standard operating procedure. <br />3. Maintenance is typically preformed using a vacuum trucks. Remove manhole cover at grade and to wer <br />vac hose into StormTrap p system or sump pit within system if applicable). Sediment should be flushed <br />towards vac hose to provide for thorough removal. When finished, replace all covers that were removed. <br />SINGLErRAP GEF THE PRECAS TAG ANrAGE! Dousurimp <br />
The URL can be used to link to this page
Your browser does not support the video tag.