Laserfiche WebLink
6.1.C. - Page 12 <br /> �d'kF��ii�3i� f�4 ""' ��s�l`� V� ����i�.e�� � <br /> ML�T�S AN�7 JARpIN DE NtN�S PARKS RENOVAT�4N PROJECT <br /> PRQJECT DESCRIPTION; <br /> ME��S PARK <br /> Mezes Parfc �s a well-used neighborhood park with an existing playground, tennis <br /> courts, bask�fiball courf, restroorn, and an open grassy picnic area. Th� park <br /> requires replacement or upgrade� to these elements including the existir�g <br /> electrical systerr� and the sxisting park sign(s}. The estimated construction cost is <br /> $425,000. <br /> JARDIN DE NINOS PARK <br /> Jardin de Ninos Park is a sr�nall neighborhood park which currently does r�ot have a <br /> restroom. The objeetive o€ this praj�ct is ta i�nprave the play strucfure(s), en�ance <br /> the parlc en�rance and o�erall appearance, ar�d install a r�ew restroorr► wi�h a pre- <br /> fabricated ADA compliant res�room. The estima�ed cor�struc#ion cost is �225,000. <br /> D�SIGN: <br /> TAS�C A-- pESIGN DEVELOPMENT/ SCHENIATiC DESIGI� <br /> 1 . Project Initiatior� and Data Collection:Assumes Start of Con#ract Oct. 3rd <br /> 2. Public Outreach <br /> A, Workshop i-Saturday, Oct 22nd at l 0arn and 1�m <br /> B. Workshop 2- Saturday, Noverrtber St�af 10 am ar�d l pm <br /> 3. Scherr�atic Desigr� Development: Oct, 3 to November 16th <br /> 4. DD/SD Staff re�iew: November 16�l� to November 22�� <br /> Deliverable: <br /> The consultant shall prepare and s�bmit �he Scherr�atic Design which incfudes two <br /> alt�mative desigr�s ar�d preliminary cast �stimates to Redwood City withir� 45 days <br /> after issuance of the notice of proceed. Seven (7) copies af th� schematic design <br /> and cost estimates are required. <br /> TASK B - CONSTEtUC�'ION DOCUM�NTA'FiOhl <br /> 1. 35%Submit�al: December 9t" <br /> 2. Sfaff R�vi�w: December 9th to January btn <br /> 3. 95%Subrnitfal:January 20'� <br /> 4. Sfaff Review; January 20'"to ��bruary 20'" <br /> 5. Signed Bid Submittal: March 12th <br /> Deliverable: <br /> a. The consulfant shaif prepare and submit �I�� 35% design which ineludes plar�s, <br /> outlir�e specificc�tions a�d cost estimate to Redwood City withir� 16 days after <br /> rec�iving camm�nts �rom the scher�atic design phase ar�d issuance appro�a{ � <br /> to proceed ta 35% design. S�ven {7) copies of the 35�o design plans, � � <br /> specifications ou�line, and cast es�ima�es are required, <br /> ; <br />