Laserfiche WebLink
6.1.C. - Page 13 <br /> b. The consultant �hall pr�pare and submit the 95�a d�sign w�ich it�cludes plar�s, <br /> specifications and cost estimate to Redwood City within 16 days after rec�iving <br /> commenfis fror� the 35� design phase and issuance approva� fio proceed ta <br /> 95% design. Seven (7) copies of the 95�o design plans, outline specificatior�s and <br /> cost estimat�s ar� r�quired. <br /> c. The �consultant shall prepare and submit the fir�al bid set, signed and stamped, <br /> which ir�cludes the finai plans, spec�ficatians and cost esfiimate to Redwoad <br /> City wit�in 2T days after receiving comments from �he 95% desigr�. Submit or�e <br /> (1] copy and one (t) CD. <br /> TASK C-- BiD AND CON5'�RUCTION SUPPORT <br /> 1. Answer questions during biddir�g process <br /> 2. Assist with Addenda <br /> 3. Pre-cor�struction Meetir�g <br /> TASK � -CONSTRUCTION ADMfNISTRATION <br /> �. Submittal and Shop draw[ngs review <br /> 2. RF! respo€�se <br /> 3. Si#e visits (8} <br /> 4. Pr�-maintenance walk fhrough and punch Eist <br /> 5. Final walk and punch list <br /> 6. Prepare record drawings <br /> - Estimated Reir�bursable: copying charges, deli�ery of hard copies, travel, parfcing, <br /> telephone ealls for business purposes. <br />